In planningNo EPBC referral

Hallett BESS

Batteries and pumped hydro · Hallett · South Australia

Capacity
50 MW
To a 132 kV line
9.5 km

Overview

Last activity 4 September 2024

Awarded in the Capacity Investment Scheme (CIS South Australia-Victoria tender, announced 4 September 2024). 50 MW (4 hour) lithium-ion battery.

Location
Hallett (town centre; the tender results do not give the site), South Australia-33.3788, 138.8773
Value
Not published
Technology
Battery, 50 MW, with 200 MWh of storage
Distance to the grid
9.5 km to a 275 kV line. 11 km to Willalo substation (275 kV).Straight line to operational lines and substations of 132 kV or more.

Approval progress

No approval on record
  1. PlanningNow

Early signals

  1. 4 Sept 2024Awarded Commonwealth underwriting in the Capacity Investment SchemeCIS South Australia-Victoria tender, announced 4 September 2024. 50 MW, 200 MWh.Capacity Investment Scheme. A signal is not a planning approval.Awarded

No state or federal approval is recorded yet. Projects appear here once lodged with the approving authority or referred under the EPBC Act. Get an email when that happens.

Reports on this project

  • Project brief, free.
  • Project dossier, On enquiry.
  • Insights report, On enquiry.

The facts on this page stay free.

What each contains
© OpenStreetMap · OpenMapTiles · OpenFreeMap
Open in the map

Site constraints

Public maps asked live, on the site and within 5 km · How it works

Site constraints

Public maps, checked as this page opens · within 5 km
Checking national and SA maps…

Who's involved

From the registers, certificates and disclosures that name the project
  1. Whyte Yarcowie Wind FarmIn assessment11 km
  2. Morgan Whyalla Pipeline No.1 Renewal – Stage 1Approved11 km
  3. Goyder North Renewable Energy Facility Stage 1, BurraApproved41 km
  4. Goyder South Hybrid Renewable Energy Facility - Wind Farm 1b, 5km south BurraApproved44 km
  5. Goyder South Hybrid Renewable Energy Facility - Wind Farm 1A, 10km south BurraApproved49 km
  6. Koolunga BESSIn planning54 km

Sources

Every fact links to the public record it came from · How the Pipeline is built
  1. Capacity Investment Scheme tender results, DCCEEWPlaced at the centre of its suburb (ABS). Licence: CC BY 4.0. Retrieved 22 November 2026.
  2. Geoscience Australia, Electricity InfrastructureDistance to the grid, measured by claused. from the project's mapped point. Licence: CC BY 4.0.