Hallett BESS
Batteries and pumped hydro · Hallett · South Australia
- Capacity
- 50 MW
- To a 132 kV line
- 9.5 km
Overview
Awarded in the Capacity Investment Scheme (CIS South Australia-Victoria tender, announced 4 September 2024). 50 MW (4 hour) lithium-ion battery.
- Location
- Hallett (town centre; the tender results do not give the site), South Australia-33.3788, 138.8773
- Value
- Not published
- Technology
- Battery, 50 MW, with 200 MWh of storage
- Owner
- EnergyAustralia
- Distance to the grid
- 9.5 km to a 275 kV line. 11 km to Willalo substation (275 kV).Straight line to operational lines and substations of 132 kV or more.
Approval progress
- PlanningNow
- Assessment
- Approved
- Construction
- Operating
Early signals
- 4 Sept 2024Awarded Commonwealth underwriting in the Capacity Investment SchemeCIS South Australia-Victoria tender, announced 4 September 2024. 50 MW, 200 MWh.Capacity Investment Scheme. A signal is not a planning approval.Awarded
No state or federal approval is recorded yet. Projects appear here once lodged with the approving authority or referred under the EPBC Act. Get an email when that happens.
Reports on this project
- Project brief, free.
- Project dossier, On enquiry.
- Insights report, On enquiry.
The facts on this page stay free.
What each contains© OpenStreetMap · OpenMapTiles · OpenFreeMap
Open in the mapSite constraints
Site constraints
Checking national and SA maps…
Who's involved
- EnergyAustraliaOwner
Nearby
- Whyte Yarcowie Wind FarmIn assessment11 km
- Morgan Whyalla Pipeline No.1 Renewal – Stage 1Approved11 km
- Goyder North Renewable Energy Facility Stage 1, BurraApproved41 km
- Goyder South Hybrid Renewable Energy Facility - Wind Farm 1b, 5km south BurraApproved44 km
- Goyder South Hybrid Renewable Energy Facility - Wind Farm 1A, 10km south BurraApproved49 km
- Koolunga BESSIn planning54 km
Sources
- Capacity Investment Scheme tender results, DCCEEWPlaced at the centre of its suburb (ABS). Licence: CC BY 4.0. Retrieved 22 November 2026.
- Geoscience Australia, Electricity InfrastructureDistance to the grid, measured by claused. from the project's mapped point. Licence: CC BY 4.0.
Spotted an error? Tell us.
Get every change to batteries and pumped hydro projects in SA, and the firms you follow, in the Monday briefing.