In assessmentNo EPBC referral

Inert Landfill, Forcett

Waste and recycling · Forcett · Tasmania

To a 132 kV line
27 km

Overview

Gadtech Pty Ltd proposes to create an inert landfill in Forcett at a site previously used as an extractive clay pit, receiving up to 10,000 tonnes per annum of clean fill.

Location
Forcett (locality centre; the EPA names the locality, not the site), Tasmania-42.8080, 147.6760
Value
Not published
Approving authority
Board of the EPA Tasmania
Distance to the grid
27 km to a 220 kV line. 27 km to Lindisfarne substation (220 kV).Straight line to operational lines and substations of 132 kV or more.

Approval progress

1 approval on record
  1. Planning
  2. AssessmentNowLodged 23 July 2021

EPA assessment is the one instrument on record for this project. Later steps appear here as the public registers record them.

  • EPA assessment, 189 Old Forcett Road, Forcett 7173 (Class 2B)Tasmania · Board of the EPA Tasmania
    23 July 2021 → pending5 years 4 months so far
    In assessment↗

Reports on this project

  • Project brief, free.
  • Project dossier, On enquiry.
  • Insights report, On enquiry.

The facts on this page stay free.

What each contains
© OpenStreetMap · OpenMapTiles · OpenFreeMap
Open in the map

Site constraints

Public maps asked live, on the site and within 5 km · How it works

Site constraints

Public maps, checked as this page opens · within 5 km
Checking national and TAS maps…
  1. Okines Beach, Lewisham ��� Foreshore Erosion MitigationIn planning6 km
  2. Poultry Processing Plant, SorellIn assessment8 km
  3. Copping Organics Facility, CoppingApproved8 km
  4. Copping Landfill, CoppingApproved8 km
  5. Hobart Airport to Sorell Southern BypassUnder construction · $116m11 km
  6. Midway Point Causeway (including McGees Bridge) and Sorell CausewayIn planning · $187m12 km

Sources

Every fact links to the public record it came from · How the Pipeline is built
  1. EPA Tasmania, proposals assessed by the EPAEPA Board assessment: Assessment Commenced. Retrieved 25 November 2026.
  2. Geoscience Australia, Electricity InfrastructureDistance to the grid, measured by claused. from the project's mapped point. Licence: CC BY 4.0.

Spotted an error? Tell us.

Get every change to waste and recycling projects in TAS, and the firms you follow, in the Monday briefing.