Skip to content
ApprovedNo EPBC referral

Copping Organics Facility, Copping

Waste and recycling · Copping · Tasmania

To a 132 kV line
35 km

Overview

Southern Waste Solutions is proposing to develop an Advanced Organics Facility (AOF) is proposed, adjacent to the existing Copping Landfill (Figure 1), to process organic waste streams.

Location
Copping (locality centre; the EPA names the locality, not the site), Tasmania-42.8260, 147.7735
Value
Not published
Approving authority
Board of the EPA Tasmania
Distance to the grid
35 km to a 220 kV line. 35 km to Lindisfarne substation (220 kV).Straight line to operational lines and substations of 132 kV or more.

Approval progress

4 approvals on record
  1. Planning
  2. AssessmentLodged 4 Aug 2021
  3. ApprovedNow
  • EPA assessment, Blue Hills Road, Copping 7174 (Class 2B)Tasmania · Board of the EPA Tasmania
    4 Aug 2021 → date not published
    Withdrawn↗
  • EPA assessment, Copping Regional Waste Depot (Class 2B)Tasmania · Board of the EPA Tasmania
    18 June 2024 → date not published
    Withdrawn↗
  • EPA assessment, Copping Landfill (Class 2A)Tasmania · Board of the EPA Tasmania
    25 June 2025 → 2 June 202611 months
    Assessment completed↗
  • EPA assessment, Copping Advanced Organics Facility (Class 2B)Tasmania · Board of the EPA Tasmania
    19 Dec 2025 → pending11 months so far
    In assessment↗

Reports on this project

  • Project brief, free.
  • Project dossier, On enquiry.
  • Insights report, On enquiry.

The facts on this page stay free.

What each contains
© OpenStreetMap · OpenMapTiles · OpenFreeMap
Open in the map

Site constraints

Public maps asked live, on the site and within 5 km · How it works

Site constraints

Public maps, checked as this page opens · within 5 km
Checking national and TAS maps…
  1. Copping Landfill, CoppingApproved0.0 km
  2. Inert Landfill, ForcettIn assessment8 km
  3. Okines Beach, Lewisham ��� Foreshore Erosion MitigationIn planning13 km
  4. Poultry Processing Plant, SorellIn assessment16 km
  5. Quarrying and Materials Handling for Dam Works, Shrub End Road, PawleenaIn assessment18 km
  6. Hobart Airport to Sorell Southern BypassUnder construction · $116m19 km

Sources

Every fact links to the public record it came from · How the Pipeline is built
  1. EPA Tasmania, proposals assessed by the EPAEPA Board assessment: Assessment Commenced. Retrieved 25 November 2026.
  2. Geoscience Australia, Electricity InfrastructureDistance to the grid, measured by claused. from the project's mapped point. Licence: CC BY 4.0.

Spotted an error? Tell us.

Get every change to waste and recycling projects in TAS, and the firms you follow, in the Monday briefing.