Poultry Processing Plant, Sorell
Waste and recycling · Sorell · Tasmania
- To a 132 kV line
- 20 km
Overview
Inghams Enterprises Pty Ltd propose to upgrade the on site waste water treatment plant and increase production to 13 600 tonnes per annum.
- Location
- Sorell (locality centre; the EPA names the locality, not the site), Tasmania-42.7785, 147.5850
- Value
- Not published
- Approving authority
- Board of the EPA Tasmania
- Distance to the grid
- 20 km to a 220 kV line. 20 km to Lindisfarne substation (220 kV).Straight line to operational lines and substations of 132 kV or more.
Approval progress
- Planning
- AssessmentNowLodged 29 Aug 2023
- Approved
- Construction
- Operating
EPA assessment is the one instrument on record for this project. Later steps appear here as the public registers record them.
- EPA assessment, Inghams Sorell (Class 2A)Tasmania · Board of the EPA Tasmania29 Aug 2023 → pending3 years 2 months so farIn assessment↗
Reports on this project
- Project brief, free.
- Project dossier, On enquiry.
- Insights report, On enquiry.
The facts on this page stay free.
What each contains© OpenStreetMap · OpenMapTiles · OpenFreeMap
Open in the mapSite constraints
Site constraints
Checking national and TAS maps…
Nearby
- Hobart Airport to Sorell Southern BypassUnder construction · $116m5 km
- Midway Point Causeway (including McGees Bridge) and Sorell CausewayIn planning · $187m5 km
- Duplication of Midway Point and Sorell CausewaysIn assessment5 km
- Quarrying and Materials Handling for Dam Works, Shrub End Road, PawleenaIn assessment7 km
- Okines Beach, Lewisham ��� Foreshore Erosion MitigationIn planning7 km
- Tasman Highway Upgrade ��� Hobart Airport to Sorell CausewayIn assessment8 km
Sources
- EPA Tasmania, proposals assessed by the EPAEPA Board assessment: Assessment Commenced. Retrieved 25 November 2026.
- Geoscience Australia, Electricity InfrastructureDistance to the grid, measured by claused. from the project's mapped point. Licence: CC BY 4.0.
Spotted an error? Tell us.
Get every change to waste and recycling projects in TAS, and the firms you follow, in the Monday briefing.