Skip to content
In assessmentNo EPBC referral

Poultry Processing Plant, Sorell

Waste and recycling · Sorell · Tasmania

To a 132 kV line
20 km

Overview

Inghams Enterprises Pty Ltd propose to upgrade the on site waste water treatment plant and increase production to 13 600 tonnes per annum.

Location
Sorell (locality centre; the EPA names the locality, not the site), Tasmania-42.7785, 147.5850
Value
Not published
Approving authority
Board of the EPA Tasmania
Distance to the grid
20 km to a 220 kV line. 20 km to Lindisfarne substation (220 kV).Straight line to operational lines and substations of 132 kV or more.

Approval progress

1 approval on record
  1. Planning
  2. AssessmentNowLodged 29 Aug 2023

EPA assessment is the one instrument on record for this project. Later steps appear here as the public registers record them.

  • EPA assessment, Inghams Sorell (Class 2A)Tasmania · Board of the EPA Tasmania
    29 Aug 2023 → pending3 years 2 months so far
    In assessment↗

Reports on this project

  • Project brief, free.
  • Project dossier, On enquiry.
  • Insights report, On enquiry.

The facts on this page stay free.

What each contains
© OpenStreetMap · OpenMapTiles · OpenFreeMap
Open in the map

Site constraints

Public maps asked live, on the site and within 5 km · How it works

Site constraints

Public maps, checked as this page opens · within 5 km
Checking national and TAS maps…
  1. Hobart Airport to Sorell Southern BypassUnder construction · $116m5 km
  2. Midway Point Causeway (including McGees Bridge) and Sorell CausewayIn planning · $187m5 km
  3. Duplication of Midway Point and Sorell CausewaysIn assessment5 km
  4. Quarrying and Materials Handling for Dam Works, Shrub End Road, PawleenaIn assessment7 km
  5. Okines Beach, Lewisham ��� Foreshore Erosion MitigationIn planning7 km
  6. Tasman Highway Upgrade ��� Hobart Airport to Sorell CausewayIn assessment8 km

Sources

Every fact links to the public record it came from · How the Pipeline is built
  1. EPA Tasmania, proposals assessed by the EPAEPA Board assessment: Assessment Commenced. Retrieved 25 November 2026.
  2. Geoscience Australia, Electricity InfrastructureDistance to the grid, measured by claused. from the project's mapped point. Licence: CC BY 4.0.

Spotted an error? Tell us.

Get every change to waste and recycling projects in TAS, and the firms you follow, in the Monday briefing.