Skip to content
In planningNo EPBC referral

Bulabul 2 BESS

Batteries and pumped hydro · Wuuluman · New South Wales

Capacity
100 MW
To a 132 kV line
6 km

Overview

Last activity 2026

Awarded in the Capacity Investment Scheme (CIS Tender 3 - NEM Dispatchable). 100 MW (4 hour) battery.

Location
Wuuluman (town centre; the tender results do not give the site), New South Wales-32.5349, 149.0855
Value
Not published
Technology
Battery, 100 MW, with 406 MWh of storage
Distance to the grid
6 km to a 330 kV line. 12 km to Wellington substation (330 kV).Straight line to operational lines and substations of 132 kV or more.

Approval progress

No approval on record
  1. PlanningNow

Early signals

  1. Date not publishedAwarded Commonwealth underwriting in the Capacity Investment SchemeCIS Tender 3, NEM Dispatchable. 100 MW, 406 MWh.Capacity Investment Scheme. A signal is not a planning approval.Awarded

No state or federal approval is recorded yet. Projects appear here once lodged with the approving authority or referred under the EPBC Act. Get an email when that happens.

Reports on this project

  • Project brief, free.
  • Project dossier, On enquiry.
  • Insights report, On enquiry.

The facts on this page stay free.

What each contains
© OpenStreetMap · OpenMapTiles · OpenFreeMap
Open in the map

Site constraints

Public maps asked live, on the site and within 5 km · How it works

Site constraints

Public maps, checked as this page opens · within 5 km
Checking national and NSW maps…

Comparable projects

Batteries and pumped hydro projects in New South Wales. Grey is the middle half of them, the marker is this project.
  • Modifications14 comparable projectsNone0.9 on average, half have 1 or fewer

Time to decision comes from the approval times benchmark. Condition counts are read from each consent's numbering.

Who's involved

From the registers, certificates and disclosures that name the project
  1. Uungula Wind FarmUnder construction · $820m7 km
  2. Wellington Compressed Air Energy Storage SystemIn planning9 km
  3. Wellington South Battery Energy Storage SystemApproved · $545m11 km
  4. Orana Battery Energy Storage System.Under construction · $879m11 km
  5. Wellington Solar FarmApproved · $269m12 km
  6. Wellington Town BESSWithdrawn13 km

Sources

Every fact links to the public record it came from · How the Pipeline is built
  1. Capacity Investment Scheme tender results, DCCEEWPlaced at the centre of its suburb (ABS). Licence: CC BY 4.0. Retrieved 22 November 2026.
  2. Geoscience Australia, Electricity InfrastructureDistance to the grid, measured by claused. from the project's mapped point. Licence: CC BY 4.0.