Yarrabee Coal Mine Continuation Project
Mining · Mining leases ML1770, ML80049, ML80050, ML80096 and others, near Blackwater · Queensland
- To a 132 kV line
- 31 km
Overview
Continuation of the Yarrabee open cut coal mine. Terms of reference for its environmental impact statement have been issued; the statement is in preparation.
- Location
- Mining leases ML1770, ML80049, ML80050, ML80096 and others, near Blackwater, Queensland-23.2742, 149.0317
- Value
- Not published
- Approving authority
- Queensland Department of the Environment, Tourism, Science and Innovation
- Distance to the grid
- 31 km to a 275 kV line. 35 km to Rangal substation (132 kV).Straight line to operational lines and substations of 132 kV or more.
Approval progress
- PlanningNow
- Assessment
- Approved
- Construction
- Operating
- Environmental impact statement (Environmental Protection Act)Queensland · Queensland Department of the Environment, Tourism, Science and Innovation · EIS100909742Not yet lodged↗
Licences
A licence lets a site carry out a scheduled activity, such as road construction, a quarry or a sewage plant, under conditions the regulator sets. The holder is often the builder.
- EPML00844613GrantedYarrabee Coal Company Pty. Ltd.Ml80172Ancillary 08 - Chemical Storage · Queensland Department of the Environment, Tourism, Science and Innovation · issued 19 Sept 2025Linked by place and name↗
Reports on this project
- Project brief, free.
- Project dossier, On enquiry.
- Insights report, On enquiry.
The facts on this page stay free.
What each contains© OpenStreetMap · OpenMapTiles · OpenFreeMap
Open in the mapSite constraints
Site constraints
Checking national and QLD maps…
Who's involved
Nearby
- Yarrabee Coal Mine ProjectIn planning4 km
- Jellinbah Coal Mine-Central North ExtensionApproved12 km
- Development and operation of the Star Coal Project Bulk Sample ProjectIn planning25 km
- Washpool Coal ProjectIn planning35 km
- Washpool Coking Coal Bulk Sample ProjectIn planning35 km
- Fairhill Coal ProjectApproved45 km
Sources
- Queensland environmental impact statementsEnvironmental impact statement EIS100909742 under the Environmental Protection Act 1994: terms of reference issued, statement in preparation. © State of Queensland (Department of the Environment, Tourism, Science and Innovation). Licence: CC BY 4.0. Retrieved 31 October 2026.
- Queensland environmental authoritiesEnvironmental authority EPML00844613 held by YARRABEE COAL COMPANY PTY. LTD., resource activity (mining or petroleum). In effect from 19 September 2025. Matched to this project by claused. from the permit's mapped location and its holder. © State of Queensland (Department of the Environment, Tourism, Science and Innovation). Licence: CC BY 4.0. Retrieved 31 October 2026.
- Geoscience Australia, Electricity InfrastructureDistance to the grid, measured by claused. from the project's mapped point. Licence: CC BY 4.0.