In planningNo EPBC referral

West Mokoan Solar Farm

Batteries and pumped hydro · Benalla · Victoria

Capacity
300 MW
To a 132 kV line
8.3 km

Overview

Last activity 11 December 2024

Awarded in the Capacity Investment Scheme (CIS Tender 1 - NEM Generation, announced 11 December 2024). Solar + Battery.

Location
Benalla (town centre; the tender results do not give the site), Victoria-36.5711, 146.0068
Value
Not published
Technology
Solar and battery, 300 MW, with 560 MWh of storage
Distance to the grid
8.3 km to a 220 kV line. 14 km to Glenrowan substation (220 kV).Straight line to operational lines and substations of 132 kV or more.

Approval progress

No approval on record
  1. PlanningNow

Early signals

  1. 11 Dec 2024Awarded Commonwealth underwriting in the Capacity Investment SchemeCIS Tender 1, NEM Generation, announced 11 December 2024. 300 MW, 560 MWh.Capacity Investment Scheme. A signal is not a planning approval.Awarded

No state or federal approval is recorded yet. Projects appear here once lodged with the approving authority or referred under the EPBC Act. Get an email when that happens.

Reports on this project

  • Project brief, free.
  • Project dossier, On enquiry.
  • Insights report, On enquiry.

The facts on this page stay free.

What each contains
© OpenStreetMap · OpenMapTiles · OpenFreeMap
Open in the map

Site constraints

Public maps asked live, on the site and within 5 km · How it works

Site constraints

Public maps, checked as this page opens · within 5 km
Checking national and VIC maps…

Who's involved

From the registers, certificates and disclosures that name the project
  1. Mokoan Solar FarmIn planning10 km
  2. Glenrowan Battery Energy Storage System (BESS)In planning14 km
  3. Winton Renewable Energy Stability and Storage Terminal (WRESST)In planning14 km
  4. Meadow Creek Solar FarmApproved38 km
  5. Mulwala Munitions Facility UpgradeApproved64 km
  6. Sunday Creek Reconfiguration ProjectIn planning68 km

Sources

Every fact links to the public record it came from · How the Pipeline is built
  1. Capacity Investment Scheme tender results, DCCEEWPlaced at the centre of its suburb (ABS). Licence: CC BY 4.0. Retrieved 22 November 2026.
  2. Geoscience Australia, Electricity InfrastructureDistance to the grid, measured by claused. from the project's mapped point. Licence: CC BY 4.0.