- Capacity
- 46 MW
- To a 132 kV line
- 2.6 km
Overview
Awarded in the Capacity Investment Scheme (CIS Tender 1 - NEM Generation, announced 11 December 2024). Solar.
- Location
- Winton (town centre; the tender results do not give the site), Victoria-36.5219, 146.0983
- Value
- Not published
- Technology
- Solar, 46 MW
- Distance to the grid
- 2.6 km to a 220 kV line. 4.4 km to Glenrowan substation (220 kV).Straight line to operational lines and substations of 132 kV or more.
Approval progress
- PlanningNow
- Assessment
- Approved
- Construction
- Operating
Early signals
- 11 Dec 2024Awarded Commonwealth underwriting in the Capacity Investment SchemeCIS Tender 1, NEM Generation, announced 11 December 2024. 46 MW.Capacity Investment Scheme. A signal is not a planning approval.Awarded
No state or federal approval is recorded yet. Projects appear here once lodged with the approving authority or referred under the EPBC Act. Get an email when that happens.
Reports on this project
- Project brief, free.
- Project dossier, On enquiry.
- Insights report, On enquiry.
The facts on this page stay free.
What each contains© OpenStreetMap · OpenMapTiles · OpenFreeMap
Open in the mapSite constraints
Site constraints
Checking national and VIC maps…
Who's involved
Nearby
- Glenrowan Battery Energy Storage System (BESS)In planning4 km
- Winton Renewable Energy Stability and Storage Terminal (WRESST)In planning4 km
- West Mokoan Solar FarmIn planning10 km
- Meadow Creek Solar FarmApproved29 km
- Sunday Creek Reconfiguration ProjectIn planning59 km
- Mulwala Munitions Facility UpgradeApproved60 km
Sources
- Capacity Investment Scheme tender results, DCCEEWPlaced at the centre of its suburb (ABS). Licence: CC BY 4.0. Retrieved 22 November 2026.
- Geoscience Australia, Electricity InfrastructureDistance to the grid, measured by claused. from the project's mapped point. Licence: CC BY 4.0.