TQM Abattoir Intensification, Cressy

Manufacturing · Cressy · Tasmania

To a 132 kV line
6.9 km

Overview

Tasmanian Quality Meats (TQM) Pty Ltd is seeking to increase the rate of production at its abattoir at 5 Burlington Road, Cressy to 33,300 tonnes meat product per year. The existing EPN 8932/2 has a production limit of 8,800 tonnes per annum (tpa) of meat product, though the proponent has temporary approval under Environment Protection Notice No 11818/ to increase production to 13,500 tpa until 30 June 2025.

Location
Cressy (locality centre; the EPA names the locality, not the site), Tasmania-41.7920, 147.0890
Value
Not published
Approving authority
Board of the EPA Tasmania
Distance to the grid
6.9 km to a 220 kV line. 8.2 km to Palmerston substation (220 kV).Straight line to operational lines and substations of 132 kV or more.

Approval progress

1 approval on record
  1. Planning
  2. AssessmentNowLodged 5 Nov 2024

EPA assessment is the one instrument on record for this project. Later steps appear here as the public registers record them.

  • EPA assessment, TQM AbattoirTasmania · Board of the EPA Tasmania
    5 Nov 2024 → pending2 years so far
    In assessment↗

Reports on this project

  • Project brief, free.
  • Project dossier, On enquiry.
  • Insights report, On enquiry.

The facts on this page stay free.

What each contains
© OpenStreetMap · OpenMapTiles · OpenFreeMap
Open in the map

Site constraints

Public maps asked live, on the site and within 5 km · How it works

Site constraints

Public maps, checked as this page opens · within 5 km
Checking national and TAS maps…
  1. Cressy Hatchery, CressyApproved0.0 km
  2. Cressy Dolomite Quarry Expansion, CressyIn assessment0.0 km
  3. Northern Midlands Solar FarmIn planning4 km
  4. Northern Midlands Irrigation SchemeApproved16 km
  5. Tyre Storage, 437 Woolmers Lane, LongfordIn assessment23 km
  6. Longford Brick Works, New Scrubber Installation, LongfordIn assessment23 km

Sources

Every fact links to the public record it came from · How the Pipeline is built
  1. EPA Tasmania, proposals assessed by the EPAEPA Board assessment: Assessment Commenced. Retrieved 25 November 2026.
  2. Geoscience Australia, Electricity InfrastructureDistance to the grid, measured by claused. from the project's mapped point. Licence: CC BY 4.0.

Spotted an error? Tell us.

Get every change to manufacturing projects in TAS, and the firms you follow, in the Monday briefing.