ApprovedNo EPBC referral

Cressy Hatchery, Cressy

Other generation · Cressy · Tasmania

To a 132 kV line
6.9 km

Overview

Petuna Aquaculture Pty Ltd (the Proponent) proposes to vary the existing Environmental Licence No. 9923/4 to increase production limits at the existing Cressy Hatchery from 600 tonnes of finfish produced per annum to 800 tonnes of finfish produced per annum. The Proponent is not proposing to increase the standing biomass limit. The proposal also seeks to increase the mass load discharge of nitrogen and phosphorus and the effluent quality limits for nitrate and total nitrogen from those in EL No. 9923/4.

Location
Cressy (locality centre; the EPA names the locality, not the site), Tasmania-41.7920, 147.0890
Value
Not published
Approving authority
Board of the EPA Tasmania
Distance to the grid
6.9 km to a 220 kV line. 8.2 km to Palmerston substation (220 kV).Straight line to operational lines and substations of 132 kV or more.

Approval progress

2 approvals on record
  1. Planning
  2. AssessmentLodged 29 Jan 2020
  3. ApprovedNow
  • EPA assessment, 155 Burlington Road, Cressy 7302 (Class 2B)Tasmania · Board of the EPA Tasmania
    29 Jan 2020 → 7 Jan 20221 year 11 months
    Assessment completed↗
  • EPA assessment, Cressy Hatchery (Class 2B)Tasmania · Board of the EPA Tasmania
    13 Apr 2026 → pending7 months so far
    In assessment↗

Reports on this project

  • Project brief, free.
  • Project dossier, On enquiry.
  • Insights report, On enquiry.

The facts on this page stay free.

What each contains
© OpenStreetMap · OpenMapTiles · OpenFreeMap
Open in the map

Site constraints

Public maps asked live, on the site and within 5 km · How it works

Site constraints

Public maps, checked as this page opens · within 5 km
Checking national and TAS maps…
  1. Cressy Dolomite Quarry Expansion, CressyIn assessment0.0 km
  2. TQM Abattoir Intensification, CressyIn assessment0.0 km
  3. Northern Midlands Solar FarmIn planning4 km
  4. Northern Midlands Irrigation SchemeApproved16 km
  5. Tyre Storage, 437 Woolmers Lane, LongfordIn assessment23 km
  6. Longford Brick Works, New Scrubber Installation, LongfordIn assessment23 km

Sources

Every fact links to the public record it came from · How the Pipeline is built
  1. EPA Tasmania, proposals assessed by the EPAEPA Board assessment: Assessment Commenced. Retrieved 25 November 2026.
  2. Geoscience Australia, Electricity InfrastructureDistance to the grid, measured by claused. from the project's mapped point. Licence: CC BY 4.0.

Spotted an error? Tell us.

Get every change to other generation projects in TAS, and the firms you follow, in the Monday briefing.