Orford Quarry Development, Orford

Quarries and extractive · Orford · Tasmania

To a 132 kV line
50 km

Overview

Stanton Excavations Pty Ltd is proposing to intensify operations at the Orford Quarry, located approximately 2.4 kilometres south of Orford. The proposal includes an increase in extraction and processing from 20,000 cubic metres to 50,000 cubic metres per annum. The proposal includes increasing the development area of the southern hard rock pit by exposing new ground which will require additional clearing of approximately 0.9 hectares of native vegetation. The proposal also includes rehabilitation outside of the boundary of the mining lease area of the northern gravel pit.

Location
Orford (locality centre; the EPA names the locality, not the site), Tasmania-42.5790, 147.8665
Value
Not published
Approving authority
Board of the EPA Tasmania
Distance to the grid
50 km to a 220 kV line. 50 km to Lindisfarne substation (220 kV).Straight line to operational lines and substations of 132 kV or more.

Approval progress

1 approval on record
  1. Planning
  2. AssessmentLodged 7 June 2024
  3. ApprovedNow

EPA assessment is the one instrument on record for this project. Later steps appear here as the public registers record them.

  • EPA assessment, Orford Quarry (Class 2A)Tasmania · Board of the EPA Tasmania
    7 June 2024 → 2 Dec 20251 year 5 months
    Assessment completed↗

Reports on this project

  • Project brief, free.
  • Project dossier, On enquiry.
  • Insights report, On enquiry.

The facts on this page stay free.

What each contains
© OpenStreetMap · OpenMapTiles · OpenFreeMap
Open in the map

Site constraints

Public maps asked live, on the site and within 5 km · How it works

Site constraints

Public maps, checked as this page opens · within 5 km
Checking national and TAS maps…
  1. Triabunna Wind FarmIn planning13 km
  2. McConnons Quarry, BucklandApproved15 km
  3. Levendale QuarryIn assessment16 km
  4. Darlington Wastewater Treatment Plant, Service Infrastructure and Water Supply UpgradeIn planning17 km
  5. Quarrying and Materials Handling for Dam Works, Shrub End Road, PawleenaIn assessment26 km
  6. Copping Organics Facility, CoppingApproved28 km

Sources

Every fact links to the public record it came from · How the Pipeline is built
  1. EPA Tasmania, proposals assessed by the EPAEPA Board assessment: Assessment Completed, 2025-12-02. Retrieved 25 November 2026.
  2. Geoscience Australia, Electricity InfrastructureDistance to the grid, measured by claused. from the project's mapped point. Licence: CC BY 4.0.

Spotted an error? Tell us.

Get every change to quarries and extractive projects in TAS, and the firms you follow, in the Monday briefing.