Health · Health and education
Narrabri Hospital
11 Cameron Street Narrabri New South Wales Australia 2390 · Narrabri Shire · New South Wales
ApprovedMP08_0073No EPBC referral
Where the approval stands
- 2.2 km
- To a 132 kV line
- StatePart 3A major project, MP08_0073
Approved. Minister for Planning. Lodged 13 August 2019. Decided 15 March 2009.
View record
Constraints
Public maps, asked when this page opens · within 5 kmChecking national and NSW maps…
Facts and sources
- Location
- 11 Cameron Street Narrabri New South Wales Australia 2390, Narrabri Shire, New South Wales
- Owner
- Not published
- Contractors
- Not named in a public source yet
- Value
- Not published
- Distance to the grid
- 2.2 km to a 132 kV line. 141 km to 330 kV. 2.2 km to Narrabri substation (132 kV).Straight line from the mapped site to operational lines and substations of 132 kV or more.
- Last activity
- 13 August 2019
- NSW Major Projects portalLicence: CC BY 4.0. Retrieved 22 October 2026.
- Geoscience Australia, Electricity InfrastructureDistance to the grid, measured by claused. from the project's mapped point. Licence: CC BY 4.0.