In planningNo EPBC referral

Muchea Battery

Batteries and pumped hydro · Muchea · Western Australia

Capacity
150 MW
To a 132 kV line
0.7 km

Overview

Last activity 2026

Awarded in the Capacity Investment Scheme (CIS Tender 2 - WEM Dispatchable). 150 MW (4 hour) battery.

Location
Muchea (town centre; the tender results do not give the site), Western Australia-31.5496, 115.9404
Value
Not published
Technology
Battery, 150 MW, with 615 MWh of storage
Owner
Neoen
Distance to the grid
0.7 km to a 132 kV line. 10 km to 330 kV. 2 km to Muchea substation (132 kV).Straight line to operational lines and substations of 132 kV or more.

Approval progress

No approval on record
  1. PlanningNow

Early signals

  1. Date not publishedAwarded Commonwealth underwriting in the Capacity Investment SchemeCIS Tender 2, WEM Dispatchable. 150 MW, 615 MWh.Capacity Investment Scheme. A signal is not a planning approval.Awarded

No state or federal approval is recorded yet. Projects appear here once lodged with the approving authority or referred under the EPBC Act. Get an email when that happens.

Reports on this project

  • Project brief, free.
  • Project dossier, On enquiry.
  • Insights report, On enquiry.

The facts on this page stay free.

What each contains
© OpenStreetMap · OpenMapTiles · OpenFreeMap
Open in the map

Site constraints

Public maps asked live, on the site and within 5 km · How it works

Site constraints

Public maps, checked as this page opens · within 5 km
Checking national and WA maps…

Who's involved

From the registers, certificates and disclosures that name the project
  1. Gonneville Nickel-Copper-Platinum Group Element Mine Development ProjectIn assessment4 km
  2. Muchea Industrial Precinct, Part of Lot 102 Great Northern Highway, MucheaApproved6 km
  3. "Muchea 6" Clay Pit Expansion projectIn assessment8 km
  4. Great Northern Highway Muchea to Wubin Upgrade Stage 2 - Muchea NorthApproved9 km
  5. Muchea Silica Sand ProjectIn planning9 km
  6. Wanneroo Shooting Complex - Public shooting rangeIn assessment13 km

Sources

Every fact links to the public record it came from · How the Pipeline is built
  1. Capacity Investment Scheme tender results, DCCEEWPlaced at the centre of its suburb (ABS). Licence: CC BY 4.0. Retrieved 22 November 2026.
  2. Geoscience Australia, Electricity InfrastructureDistance to the grid, measured by claused. from the project's mapped point. Licence: CC BY 4.0.