Skip to content
Ganymirra Solar Power Station
Batteries and pumped hydro · Majors Creek · Queensland
- Capacity
- 150 MW
- To a 132 kV line
- 1.9 km
Overview
Awarded in the Capacity Investment Scheme (CIS Tender 1 - NEM Generation, announced 11 December 2024). Solar + Battery.
- Location
- Majors Creek (town centre; the tender results do not give the site), Queensland-19.6430, 147.0028
- Value
- Not published
- Technology
- Solar and battery, 150 MW, with 600 MWh of storage
- Owner
- Edify Energy
- Distance to the grid
- 1.9 km to a 132 kV line. 4 km to 275 kV. 12 km to Haughton River substation (275 kV).Straight line to operational lines and substations of 132 kV or more.
Approval progress
- PlanningNow
- Assessment
- Approved
- Construction
- Operating
Early signals
- 11 Dec 2024Awarded Commonwealth underwriting in the Capacity Investment SchemeCIS Tender 1, NEM Generation, announced 11 December 2024. 150 MW, 600 MWh.Capacity Investment Scheme. A signal is not a planning approval.Awarded
No state or federal approval is recorded yet. Projects appear here once lodged with the approving authority or referred under the EPBC Act. Get an email when that happens.
Reports on this project
- Project brief, free.
- Project dossier, On enquiry.
- Insights report, On enquiry.
The facts on this page stay free.
What each contains© OpenStreetMap · OpenMapTiles · OpenFreeMap
Open in the mapSite constraints
Site constraints
Checking national and QLD maps…
Who's involved
- Edify EnergyOwner
Nearby
Sources
- Capacity Investment Scheme tender results, DCCEEWPlaced at the centre of its suburb (ABS). Licence: CC BY 4.0. Retrieved 22 November 2026.
- Geoscience Australia, Electricity InfrastructureDistance to the grid, measured by claused. from the project's mapped point. Licence: CC BY 4.0.