Ganymirra Solar Power Station

Batteries and pumped hydro · Majors Creek · Queensland

Capacity
150 MW
To a 132 kV line
1.9 km

Overview

Last activity 11 December 2024

Awarded in the Capacity Investment Scheme (CIS Tender 1 - NEM Generation, announced 11 December 2024). Solar + Battery.

Location
Majors Creek (town centre; the tender results do not give the site), Queensland-19.6430, 147.0028
Value
Not published
Technology
Solar and battery, 150 MW, with 600 MWh of storage
Distance to the grid
1.9 km to a 132 kV line. 4 km to 275 kV. 12 km to Haughton River substation (275 kV).Straight line to operational lines and substations of 132 kV or more.

Approval progress

No approval on record
  1. PlanningNow

Early signals

  1. 11 Dec 2024Awarded Commonwealth underwriting in the Capacity Investment SchemeCIS Tender 1, NEM Generation, announced 11 December 2024. 150 MW, 600 MWh.Capacity Investment Scheme. A signal is not a planning approval.Awarded

No state or federal approval is recorded yet. Projects appear here once lodged with the approving authority or referred under the EPBC Act. Get an email when that happens.

Reports on this project

  • Project brief, free.
  • Project dossier, On enquiry.
  • Insights report, On enquiry.

The facts on this page stay free.

What each contains
© OpenStreetMap · OpenMapTiles · OpenFreeMap
Open in the map

Site constraints

Public maps asked live, on the site and within 5 km · How it works

Site constraints

Public maps, checked as this page opens · within 5 km
Checking national and QLD maps…

Who's involved

From the registers, certificates and disclosures that name the project
  1. Majors Creek Solar Power StationIn planning0.0 km
  2. Major Creek Energy Storage SystemIn planning0.0 km
  3. Ganymirra Energy Storage SystemIn planning0.0 km
  4. Cambridge Solar Farm and Battery Energy Storage SystemIn planning10 km
  5. Supernode NorthIn planning18 km
  6. Project Green PolyIn assessment18 km

Sources

Every fact links to the public record it came from · How the Pipeline is built
  1. Capacity Investment Scheme tender results, DCCEEWPlaced at the centre of its suburb (ABS). Licence: CC BY 4.0. Retrieved 22 November 2026.
  2. Geoscience Australia, Electricity InfrastructureDistance to the grid, measured by claused. from the project's mapped point. Licence: CC BY 4.0.

Spotted an error? Tell us.

Get every change to batteries and pumped hydro projects in QLD, and the firms you follow, in the Monday briefing.