Donalds Road Quarry, Donalds Road, Roger River

Quarries and extractive · Roger River · Tasmania

To a 132 kV line
73 km

Overview

Cresswells Transport Pty Ltd propose to operate a new quarry that will extract and process up to 20,000 cubic metres (approximately 32,000 tonnes) of dolomite lime rock per annum. The proposed quarry will be a drill and blast operation, located on an existing dairy property approximately 25 kilometres southwest of Smithton.

Location
Roger River (locality centre; the EPA names the locality, not the site), Tasmania-41.0495, 145.0280
Value
Not published
Approving authority
Board of the EPA Tasmania
Distance to the grid
73 km to a 220 kV line. 73 km to Burnie substation (220 kV).Straight line to operational lines and substations of 132 kV or more.

Approval progress

1 approval on record
  1. Planning
  2. AssessmentLodged 19 Oct 2022
  3. ApprovedNow

EPA assessment is the one instrument on record for this project. Later steps appear here as the public registers record them.

  • EPA assessment, Donalds Road Quarry (Class 2A)Tasmania · Board of the EPA Tasmania
    19 Oct 2022 → 31 Oct 20242 years
    Assessment completed↗

Reports on this project

  • Project brief, free.
  • Project dossier, On enquiry.
  • Insights report, On enquiry.

The facts on this page stay free.

What each contains
© OpenStreetMap · OpenMapTiles · OpenFreeMap
Open in the map

Site constraints

Public maps asked live, on the site and within 5 km · How it works

Site constraints

Public maps, checked as this page opens · within 5 km
Checking national and TAS maps…
  1. Apiary Road Quarry, TrowuttaIn assessment8 km
  2. Blackwater – Silica Mine ExtensionIn assessment10 km
  3. Blackwater South Mine Silica DepositIn planning13 km
  4. Tasmanian Advanced Minerals - Hawkes Creek silica mine expansionApproved13 km
  5. Salmon River Road Quarry, TemmaIn assessment17 km
  6. Bass Highway – Marrawah to Wynyard UpgradeUnder construction · $100m22 km

Sources

Every fact links to the public record it came from · How the Pipeline is built
  1. EPA Tasmania, proposals assessed by the EPAEPA Board assessment: Assessment Completed, 2024-10-31. Retrieved 25 November 2026.
  2. Geoscience Australia, Electricity InfrastructureDistance to the grid, measured by claused. from the project's mapped point. Licence: CC BY 4.0.

Spotted an error? Tell us.

Get every change to quarries and extractive projects in TAS, and the firms you follow, in the Monday briefing.