Apiary Road Quarry, Trowutta

Quarries and extractive · Trowutta · Tasmania

To a 132 kV line
65 km

Overview

Sustainable Timbers Tasmania (STT) proposes to develop a new drilling and blasting quarry to produce road building and sheeting material. According to the permit application, the proposal is on Permanent Timber Production Zone land, will involve the extraction, crushing and screening of up to 20,000m3 per year, and will necessitate the clearing of 3.6 hectares of post-harvest regrowth forest.

Location
Trowutta (locality centre; the EPA names the locality, not the site), Tasmania-41.0650, 145.1220
Value
Not published
Approving authority
Board of the EPA Tasmania
Distance to the grid
65 km to a 220 kV line. 65 km to Burnie substation (220 kV).Straight line to operational lines and substations of 132 kV or more.

Approval progress

1 approval on record
  1. Planning
  2. AssessmentNowLodged 24 Mar 2026

EPA assessment is the one instrument on record for this project. Later steps appear here as the public registers record them.

  • EPA assessment, Apiary Road Quarry (Class 2A)Tasmania · Board of the EPA Tasmania
    24 Mar 2026 → pending8 months so far
    In assessment↗

Reports on this project

  • Project brief, free.
  • Project dossier, On enquiry.
  • Insights report, On enquiry.

The facts on this page stay free.

What each contains
© OpenStreetMap · OpenMapTiles · OpenFreeMap
Open in the map

Site constraints

Public maps asked live, on the site and within 5 km · How it works

Site constraints

Public maps, checked as this page opens · within 5 km
Checking national and TAS maps…
  1. Donalds Road Quarry, Donalds Road, Roger RiverApproved8 km
  2. Robbins Island Road to Hampshire Transmission LineIn assessment16 km
  3. Blackwater – Silica Mine ExtensionIn assessment16 km
  4. Peppermint Hill Quarry, Increase in crushing volume, MenghaApproved18 km
  5. Blackwater South Mine Silica DepositIn planning18 km
  6. Bass Highway – Marrawah to Wynyard UpgradeUnder construction · $100m19 km

Sources

Every fact links to the public record it came from · How the Pipeline is built
  1. EPA Tasmania, proposals assessed by the EPAEPA Board assessment: Assessment Commenced. Retrieved 25 November 2026.
  2. Geoscience Australia, Electricity InfrastructureDistance to the grid, measured by claused. from the project's mapped point. Licence: CC BY 4.0.