Skip to content
In planningEPBC 2026/10619 · EPBC referred, decision pending

Ballyrogan Wind Farm

Wind · Victoria

To a 132 kV line
7.7 km

Overview

Last activity 2026
Location
Victoria-37.3140, 143.0750
Value
Not published
Approving authority
Australian Government (DCCEEW)
Distance to the grid
7.7 km to a 132 kV line. 22 km to 220 kV. 8.3 km to Ararat Wind Farm substation (132 kV).Straight line to operational lines and substations of 132 kV or more.

Approval progress

1 approval on record
  1. PlanningNow

The EPBC referral is the one instrument on record for this project. Later steps appear here as the public registers record them.

  • EPBC Act referralCommonwealth · Australian Government (DCCEEW) · EPBC 2026/10619
    Referred, decision pending↗

Reports on this project

  • Project brief, free.
  • Project dossier, On enquiry.
  • Insights report, On enquiry.

The facts on this page stay free.

What each contains
© OpenStreetMap · OpenMapTiles · OpenFreeMap
Open in the map

Site constraints

Public maps asked live, on the site and within 5 km · How it works

Site constraints

Public maps, checked as this page opens · within 5 km
Checking national and VIC maps…
  1. Murray Basin Rail Project – Ararat to Maryborough rail line Occupation Crossings UpgradeIn planning28 km
  2. Western Highway Upgrade, Buangor to AraratApproved30 km
  3. East Grampians Rural PipelineApproved30 km
  4. Beaufort BypassIn assessment31 km
  5. Joel Joel Battery Energy Storage System ProjectIn planning32 km
  6. Watta Wella Renewable Energy ProjectIn assessment36 km

Sources

Every fact links to the public record it came from · How the Pipeline is built
  1. EPBC Act referrals, Australian GovernmentLicence: CC BY 4.0. Retrieved 22 November 2026.
  2. Geoscience Australia, Electricity InfrastructureDistance to the grid, measured by claused. from the project's mapped point. Licence: CC BY 4.0.

Spotted an error? Tell us.

Get every change to wind projects in VIC, and the firms you follow, in the Monday briefing.