In planningNo EPBC referral

Woolsthorpe Wind Farm

Wind · Woolsthorpe · Victoria

Capacity
72 MW
To a 132 kV line
4.2 km

Overview

Last activity 23 May 2026

Awarded in the Capacity Investment Scheme (CIS Tender 7 - NEM Generation, announced 23 May 2026). Wind.

Location
Woolsthorpe (town centre; the tender results do not give the site), Victoria-38.1518, 142.4673
Value
Not published
Technology
Wind, 72 MW
Distance to the grid
4.2 km to a 500 kV line. 20 km to Mortlake substation (500 kV).Straight line to operational lines and substations of 132 kV or more.

Approval progress

No approval on record
  1. PlanningNow

Early signals

  1. 23 May 2026Awarded Commonwealth underwriting in the Capacity Investment SchemeCIS Tender 7, NEM Generation, announced 23 May 2026. 72 MW.Capacity Investment Scheme. A signal is not a planning approval.Awarded

No state or federal approval is recorded yet. Projects appear here once lodged with the approving authority or referred under the EPBC Act. Get an email when that happens.

Reports on this project

  • Project brief, free.
  • Project dossier, On enquiry.
  • Insights report, On enquiry.

The facts on this page stay free.

What each contains
© OpenStreetMap · OpenMapTiles · OpenFreeMap
Open in the map

Site constraints

Public maps asked live, on the site and within 5 km · How it works

Site constraints

Public maps, checked as this page opens · within 5 km
Checking national and VIC maps…

Who's involved

From the registers, certificates and disclosures that name the project
  1. Hexham Wind FarmIn assessment15 km
  2. Warrnambool Base Hospital redevelopment (incl Warrnambool Logistics Hub)Under construction · $396m24 km
  3. Willatook Wind Farm, VicIn assessment26 km
  4. Mt Fyans Wind FarmIn assessment34 km
  5. Swansons Lane Wind FarmIn assessment35 km
  6. Darlington Wind FarmIn planning46 km

Sources

Every fact links to the public record it came from · How the Pipeline is built
  1. Capacity Investment Scheme tender results, DCCEEWPlaced at the centre of its suburb (ABS). Licence: CC BY 4.0. Retrieved 22 November 2026.
  2. Geoscience Australia, Electricity InfrastructureDistance to the grid, measured by claused. from the project's mapped point. Licence: CC BY 4.0.