Skip to content
ApprovedC54cora · No EPBC referral

Terang Battery Energy Storage System

Batteries and pumped hydro · Corangamite · Victoria

To a 132 kV line
12 km

Overview

The amendment applies the Specific Controls Overlay to 70 Littles Lane, Terang, and introduces the Terang Battery Energy Storage System (BESS) - 70 Littles Lane, Terang, Incorporated Document, February 2021 to facilitate the use and development of a 220MWh battery energy storage system (BESS).

Location
Corangamite (council area centre; the amendment names the council, not the site), Victoria-38.2145, 143.2430
Value
Not published
Approving authority
Victorian Minister for Planning
Distance to the grid
12 km to a 220 kV line. 24 km to Haunted Gully substation (500 kV).Straight line to operational lines and substations of 132 kV or more.

Approval progress

1 approval on record
  1. Planning
  2. Assessment
  3. ApprovedNowApproved 9 May 2021

Planning scheme amendment is the one instrument on record for this project. Later steps appear here as the public registers record them.

  • Planning scheme amendment (Corangamite)Victoria · Victorian Minister for Planning · C54cora
    Lodged, date not published → 9 May 2021
    Approved↗

Reports on this project

  • Project brief, free.
  • Project dossier, On enquiry.
  • Insights report, On enquiry.

The facts on this page stay free.

What each contains
© OpenStreetMap · OpenMapTiles · OpenFreeMap
Open in the map

Site constraints

Public maps asked live, on the site and within 5 km · How it works

Site constraints

Public maps, checked as this page opens · within 5 km
Checking national and VIC maps…
  1. Murchs Corner Battery Energy Storage System (BESS)In planning29 km
  2. Mumblin Wind FarmIn assessment30 km
  3. Holcim Colac Quarry Expansion- Stage 5 and Stage 6Approved33 km
  4. Darlington Wind FarmIn planning33 km
  5. Swansons Lane Wind FarmIn assessment36 km
  6. Mt Fyans Wind FarmIn assessment45 km

Sources

Every fact links to the public record it came from · How the Pipeline is built
  1. Victorian planning scheme amendments, Department of Transport and PlanningAmendment C54cora: Finished, approved, decided 2021-05-09, gazetted 2021-05-28. Retrieved 25 November 2026.
  2. Geoscience Australia, Electricity InfrastructureDistance to the grid, measured by claused. from the project's mapped point. Licence: CC BY 4.0.

Spotted an error? Tell us.

Get every change to batteries and pumped hydro projects in VIC, and the firms you follow, in the Monday briefing.