In planningNo EPBC referral

Springvale Energy Hub

Batteries and pumped hydro · Springvale · Victoria

Capacity
115 MW
To a 132 kV line
1.6 km

Overview

Last activity 4 September 2024

Awarded in the Capacity Investment Scheme (CIS South Australia-Victoria tender, announced 4 September 2024). 115 MW (2 hour) lithium-ion battery.

Location
Springvale (town centre; the tender results do not give the site), Victoria-37.9441, 145.1619
Value
Not published
Technology
Battery, 115 MW, with 230 MWh of storage
Distance to the grid
1.6 km to a 220 kV line. 2.2 km to Springvale substation (220 kV).Straight line to operational lines and substations of 132 kV or more.

Approval progress

No approval on record
  1. PlanningNow

Early signals

  1. 4 Sept 2024Awarded Commonwealth underwriting in the Capacity Investment SchemeCIS South Australia-Victoria tender, announced 4 September 2024. 115 MW, 230 MWh.Capacity Investment Scheme. A signal is not a planning approval.Awarded

No state or federal approval is recorded yet. Projects appear here once lodged with the approving authority or referred under the EPBC Act. Get an email when that happens.

Reports on this project

  • Project brief, free.
  • Project dossier, On enquiry.
  • Insights report, On enquiry.

The facts on this page stay free.

What each contains
© OpenStreetMap · OpenMapTiles · OpenFreeMap
Open in the map

Site constraints

Public maps asked live, on the site and within 5 km · How it works

Site constraints

Public maps, checked as this page opens · within 5 km
Checking national and VIC maps…

Who's involved

From the registers, certificates and disclosures that name the project
  1. Monash Medical Centre RedevelopmentApproved · $535m4 km
  2. Dandenong Hospital RedevelopmentIn planning · $305m6 km
  3. Mordialloc Bypass Project, VicApproved7 km
  4. Pound Road West Upgrade, Dandenong SouthApproved7 km
  5. Suburban Rail Loop EastUnder construction · $35bn8 km
  6. Eastern treatment plant sludge dewatering upgrade projectApproved · $192m12 km

Sources

Every fact links to the public record it came from · How the Pipeline is built
  1. Capacity Investment Scheme tender results, DCCEEWPlaced at the centre of its suburb (ABS). Licence: CC BY 4.0. Retrieved 22 November 2026.
  2. Geoscience Australia, Electricity InfrastructureDistance to the grid, measured by claused. from the project's mapped point. Licence: CC BY 4.0.