Skip to content
ApprovedC322yara · No EPBC referral

Richmond Power Station Renewal

Housing · Yarra · Victoria

To a 132 kV line
2.5 km

Overview

The amendment facilitates the renewal and adaptive reuse of the Former Richmond Power Station at 300/658 Church Street, Cremorne for an Integrated mixed-use innovation centre in accordance with the approved Incorporated Document titled Richmond Power Station Renewal Project 300/658 Church Street, Cremorne, (Department of Transport and Planning, April 2024).

Location
Yarra (council area centre; the amendment names the council, not the site), Victoria-37.8090, 145.0220
Value
Not published
Approving authority
Victorian Minister for Planning
Distance to the grid
2.5 km to a 220 kV line. 3 km to Richmond substation (220 kV).Straight line to operational lines and substations of 132 kV or more.

Approval progress

1 approval on record
  1. Planning
  2. Assessment
  3. ApprovedNowApproved 24 June 2024

Planning scheme amendment is the one instrument on record for this project. Later steps appear here as the public registers record them.

  • Planning scheme amendment (Yarra)Victoria · Victorian Minister for Planning · C322yara
    Lodged, date not published → 24 June 2024
    Approved↗

Reports on this project

  • Project brief, free.
  • Project dossier, On enquiry.
  • Insights report, On enquiry.

The facts on this page stay free.

What each contains
© OpenStreetMap · OpenMapTiles · OpenFreeMap
Open in the map

Site constraints

Public maps asked live, on the site and within 5 km · How it works

Site constraints

Public maps, checked as this page opens · within 5 km
Checking national and VIC maps…
  1. Mercy Health Retirement AccommodationIn planning2 km
  2. Redevelopment of Thomas Embling Hospital Stage 3Under construction · $53m3 km
  3. Forensic Mental Health Expansion Project Stage 1 and 2Under construction · $462m3 km
  4. Port Rail Shuttle NetworkUnder construction · $140m4 km
  5. Construction of a mixed use retail and residential development.In planning4 km
  6. Academy of Mary Immaculate, FitzroyIn planning4 km

Sources

Every fact links to the public record it came from · How the Pipeline is built
  1. Victorian planning scheme amendments, Department of Transport and PlanningAmendment C322yara: Finished, approved, decided 2024-06-24, gazetted 2024-07-04. Retrieved 25 November 2026.
  2. Geoscience Australia, Electricity InfrastructureDistance to the grid, measured by claused. from the project's mapped point. Licence: CC BY 4.0.

Spotted an error? Tell us.