Skip to content
In planningNo EPBC referral

Reeves Plains

Batteries and pumped hydro · Reeves Plains · South Australia

Capacity
250 MW
To a 132 kV line
0.2 km

Overview

Last activity 2026

Awarded in the Capacity Investment Scheme (CIS Tender 3 - NEM Dispatchable). 250 MW (4 hour) battery.

Location
Reeves Plains (town centre; the tender results do not give the site), South Australia-34.5411, 138.6242
Value
Not published
Technology
Battery, 250 MW, with 1,000 MWh of storage
Distance to the grid
0.2 km to a 275 kV line. 13 km to Roseworthy substation (132 kV).Straight line to operational lines and substations of 132 kV or more.

Approval progress

No approval on record
  1. PlanningNow

Early signals

  1. Date not publishedAwarded Commonwealth underwriting in the Capacity Investment SchemeCIS Tender 3, NEM Dispatchable. 250 MW, 1,000 MWh.Capacity Investment Scheme. A signal is not a planning approval.Awarded

No state or federal approval is recorded yet. Projects appear here once lodged with the approving authority or referred under the EPBC Act. Get an email when that happens.

Reports on this project

  • Project brief, free.
  • Project dossier, On enquiry.
  • Insights report, On enquiry.

The facts on this page stay free.

What each contains
© OpenStreetMap · OpenMapTiles · OpenFreeMap
Open in the map

Site constraints

Public maps asked live, on the site and within 5 km · How it works

Site constraints

Public maps, checked as this page opens · within 5 km
Checking national and SA maps…

Who's involved

From the registers, certificates and disclosures that name the project
  1. Rural Roads Package - Safety PackageUnder construction · $160m25 km
  2. Osborne North Car Park and Grade Separated RoadIn planning29 km
  3. Lefevre Peninsula UpgradesUnder construction · $100m29 km
  4. The Botanic Loop (Grey-headed Flying-fox viewing experience)In assessment42 km
  5. Adelaide Festival Centre Precinct Upgrade, AdelaideIn planning42 km
  6. New Women’s and Children’s HospitalIn planning42 km

Sources

Every fact links to the public record it came from · How the Pipeline is built
  1. Capacity Investment Scheme tender results, DCCEEWPlaced at the centre of its suburb (ABS). Licence: CC BY 4.0. Retrieved 22 November 2026.
  2. Geoscience Australia, Electricity InfrastructureDistance to the grid, measured by claused. from the project's mapped point. Licence: CC BY 4.0.

Spotted an error? Tell us.