Reeves Plains
Batteries and pumped hydro · Reeves Plains · South Australia
- Capacity
- 250 MW
- To a 132 kV line
- 0.2 km
Overview
Awarded in the Capacity Investment Scheme (CIS Tender 3 - NEM Dispatchable). 250 MW (4 hour) battery.
- Location
- Reeves Plains (town centre; the tender results do not give the site), South Australia-34.5411, 138.6242
- Value
- Not published
- Technology
- Battery, 250 MW, with 1,000 MWh of storage
- Owner
- Alinta Energy
- Distance to the grid
- 0.2 km to a 275 kV line. 13 km to Roseworthy substation (132 kV).Straight line to operational lines and substations of 132 kV or more.
Approval progress
- PlanningNow
- Assessment
- Approved
- Construction
- Operating
Early signals
- Date not publishedAwarded Commonwealth underwriting in the Capacity Investment SchemeCIS Tender 3, NEM Dispatchable. 250 MW, 1,000 MWh.Capacity Investment Scheme. A signal is not a planning approval.Awarded
No state or federal approval is recorded yet. Projects appear here once lodged with the approving authority or referred under the EPBC Act. Get an email when that happens.
Reports on this project
- Project brief, free.
- Project dossier, On enquiry.
- Insights report, On enquiry.
The facts on this page stay free.
What each contains© OpenStreetMap · OpenMapTiles · OpenFreeMap
Open in the mapSite constraints
Site constraints
Checking national and SA maps…
Who's involved
- Alinta EnergyOwner
Nearby
- Rural Roads Package - Safety PackageUnder construction · $160m25 km
- Osborne North Car Park and Grade Separated RoadIn planning29 km
- Lefevre Peninsula UpgradesUnder construction · $100m29 km
- The Botanic Loop (Grey-headed Flying-fox viewing experience)In assessment42 km
- Adelaide Festival Centre Precinct Upgrade, AdelaideIn planning42 km
- New Women’s and Children’s HospitalIn planning42 km
Sources
- Capacity Investment Scheme tender results, DCCEEWPlaced at the centre of its suburb (ABS). Licence: CC BY 4.0. Retrieved 22 November 2026.
- Geoscience Australia, Electricity InfrastructureDistance to the grid, measured by claused. from the project's mapped point. Licence: CC BY 4.0.
Spotted an error? Tell us.
Get every change to batteries and pumped hydro projects in SA, and the firms you follow, in the Monday briefing.