Skip to content
In planningSSD-155572991 · No EPBC referral

Redbank Data Centre

Data centres · rural land at Rowan, Gregadoo and Gelston Park, south-east of Wagga Wagga, generally bounded by Boiling Down Road, Redbank Road and Plumpton Road. · Wagga Wagga City · New South Wales

To a 132 kV line
1.3 km

Overview

Last activity 13 November 2026
Location
rural land at Rowan, Gregadoo and Gelston Park, south-east of Wagga Wagga, generally bounded by Boiling Down Road, Redbank Road and Plumpton Road., Wagga Wagga City, New South Wales-35.1700, 147.3900
Value
Not published
Approving authority
NSW Department of Planning
Distance to the grid
1.3 km to a 132 kV line. 3.4 km to 330 kV. 3.4 km to Wagga 330 substation (330 kV).Straight line to operational lines and substations of 132 kV or more.
NSW portal case
SSD-155572991First record 13 November 2026

Approval progress

1 approval on record · Assessment requirements issued
  1. PlanningNowFirst record 13 Nov 2026

State significant development is the one instrument on record for this project. Later steps appear here as the public registers record them.

  • State significant developmentNew South Wales · NSW Department of Planning · SSD-155572991
    First record 13 Nov 2026
    Not yet lodged↗

Reports on this project

  • Project brief, free.
  • Project dossier, On enquiry.
  • Insights report, On enquiry.

The facts on this page stay free.

What each contains
© OpenStreetMap · OpenMapTiles · OpenFreeMap
Open in the map

Site constraints

Public maps asked live, on the site and within 5 km · How it works

Site constraints

Public maps, checked as this page opens · within 5 km
Checking national and NSW maps…
  1. Gregadoo Solar FarmApproved · $61m3 km
  2. Project EnergyConnect (NSW - Eastern Section)Approved · $1.1bn3 km
  3. Waste-oil re-refinery, Wagga Wagga Special Activation PrecinctIn planning4 km
  4. Biomethane production facility, Wagga Wagga Special Activation PrecinctIn planning4 km
  5. Wagga South Battery Energy Storage SystemIn planning4 km
  6. Wagga Wagga Lithium Ion Battery Recycling FacilityIn assessment · $1.5m4 km

Sources

Every fact links to the public record it came from · How the Pipeline is built
  1. NSW Major Projects portalLicence: CC BY 4.0. Retrieved 13 November 2026.
  2. Geoscience Australia, Electricity InfrastructureDistance to the grid, measured by claused. from the project's mapped point. Licence: CC BY 4.0.
  3. NSW Major Projects, case recordDetermination authority, portal stage and modification cases. Licence: CC BY 4.0. © State of New South Wales and Department of Planning, Housing and Infrastructure.

Spotted an error? Tell us.

Get every change to data centres projects in NSW, and the firms you follow, in the Monday briefing.