The proposal is for the construction of a new Electrolysis Plant (Cell House) at the Nyrstar Hobart site. The electrolysis plant will be constructed next to the existing electrolysis plant and will replace the existing plant once commissioned. The proposed facility will produce up to 300,000 tonnes per annum of cathode zinc.

Location
Lutana (locality centre; the EPA names the locality, not the site), Tasmania-42.8365, 147.3095
Value
Not published
Approving authority
Board of the EPA Tasmania
Distance to the grid
3.4 km to a 220 kV line. 3.5 km to Lindisfarne substation (220 kV).Straight line to operational lines and substations of 132 kV or more.

Approval progress

1 approval on record
  1. Planning
  2. AssessmentLodged 10 June 2020
  3. ApprovedNow

EPA assessment is the one instrument on record for this project. Later steps appear here as the public registers record them.

  • EPA assessment, Hobart Zinc Smelter, 300 Risdon Road, Lutana 7010 (Class 2B)Tasmania · Board of the EPA Tasmania
    10 June 2020 → 5 Apr 20221 year 9 months
    Assessment completed↗

Reports on this project

  • Project brief, free.
  • Project dossier, On enquiry.
  • Insights report, On enquiry.

The facts on this page stay free.

What each contains
© OpenStreetMap · OpenMapTiles · OpenFreeMap
Open in the map

Site constraints

Public maps asked live, on the site and within 5 km · How it works

Site constraints

Public maps, checked as this page opens · within 5 km
Checking national and TAS maps…
  1. Lutana Resource Recovery Works, LutanaApproved0.0 km
  2. Wharf Mid Span Remediation, Nyrstar Hobart, LutanaApproved0.0 km
  3. Clinical Waste Treatment Facility, Derwent ParkApproved1 km
  4. Hobart Milk Factory, MoonahApproved1 km
  5. Selfs Point Sewage Treatment Plant and Wastewater PipelineIn planning2 km
  6. Residential Development, West Moonah and Lenah Valley, TasApproved3 km

Sources

Every fact links to the public record it came from · How the Pipeline is built
  1. EPA Tasmania, proposals assessed by the EPAEPA Board assessment: Assessment Completed, 2022-04-05. Retrieved 25 November 2026.
  2. Geoscience Australia, Electricity InfrastructureDistance to the grid, measured by claused. from the project's mapped point. Licence: CC BY 4.0.

Spotted an error? Tell us.

Get every change to hydrogen projects in TAS, and the firms you follow, in the Monday briefing.