Skip to content
In assessmentDA007/26 · No EPBC referral

Multi-Dwelling Housing, 33 Magpie Hollow Road South Bowenfels

Housing · 33 MAGPIE HOLLOW ROAD SOUTH BOWENFELS 2790 · Lithgow City Council · New South Wales

Estimated development cost
$77m
To a 132 kV line
0.3 km

Overview

Last activity 28 January 2026

Development application to Lithgow City Council for multi-dwelling housing, erection of a new structure, residential accommodation. 201 new dwellings. 1 storeys.

Location
33 MAGPIE HOLLOW ROAD SOUTH BOWENFELS 2790, Lithgow City Council, New South Wales-33.5068, 150.1173
Value
$77m, estimated development cost
Approving authority
Lithgow City Council
Distance to the grid
0.3 km to a 132 kV line. 1.4 km to 330 kV. 12 km to Wallerawang 330 substation (330 kV).Straight line to operational lines and substations of 132 kV or more.

Approval progress

1 approval on record
  1. Planning
  2. AssessmentNowLodged 28 Jan 2026

Development application is the one instrument on record for this project. Later steps appear here as the public registers record them.

  • Development applicationNew South Wales · Lithgow City Council · DA007/26
    28 Jan 2026 → pending9 months so far
    In assessment

Reports on this project

  • Project brief, free.
  • Project dossier, On enquiry.
  • Insights report, On enquiry.

The facts on this page stay free.

What each contains
© OpenStreetMap · OpenMapTiles · OpenFreeMap
Open in the map

Site constraints

Public maps asked live, on the site and within 5 km · How it works

Site constraints

Public maps, checked as this page opens · within 5 km
Checking national and NSW maps…

Comparable projects

Housing projects in New South Wales. Grey is the middle half of them, the marker is this project.
  • Modifications109 comparable projectsNone2.2 on average, half have 2 or fewer

Time to decision comes from the approval times benchmark. Condition counts are read from each consent's numbering.

  1. Lake Lyell Pumped Hydro Energy StorageIn assessment3 km
  2. Wallerawang, Litgow Silicon SmelterApproved3 km
  3. Lake Lyell Pumped HydroWithdrawn4 km
  4. Austen QuarryApproved8 km
  5. Lithgow Correctional CentreApproved9 km
  6. Wallerawang QuarryApproved9 km

Sources

Every fact links to the public record it came from · How the Pipeline is built
  1. NSW Planning Portal, development applicationsDevelopment application DA007/26 lodged with Lithgow City Council on 28 January 2026. Value: the estimated cost of development the applicant lodged. © State of New South Wales (Department of Planning, Housing and Infrastructure). Licence: CC BY 4.0. Retrieved 31 October 2026.
  2. Geoscience Australia, Electricity InfrastructureDistance to the grid, measured by claused. from the project's mapped point. Licence: CC BY 4.0.

Spotted an error? Tell us.

Get every change to housing projects in NSW, and the firms you follow, in the Monday briefing.