Mt Oriel Quarry, Expansion and Intensification, Breadalbane
Waste and recycling · Breadalbane · Tasmania
- To a 132 kV line
- 7.9 km
Overview
The proposal is to increase production from a maximum 200,000 cubic metres per year for the Cocked Hat Hill permit and maximum 55,000 metres per year for McGraths to a maximum 500,000 cubic metres per year (assumed 900,000 tonnes of product per annum based on a given BD of 1.8 tonnes per cubic metre. The company also propose to import hard material (clean fill), consisting of concrete waste and recycled rock, which will be crushed, screened, and blended on-site, to be exported out for re-use.
- Location
- Breadalbane (locality centre; the EPA names the locality, not the site), Tasmania-41.5175, 147.1885
- Value
- Not published
- Approving authority
- Board of the EPA Tasmania
- Distance to the grid
- 7.9 km to a 220 kV line. 8 km to Hadspen substation (220 kV).Straight line to operational lines and substations of 132 kV or more.
Approval progress
- Planning
- AssessmentNowLodged 12 Apr 2024
- Approved
- Construction
- Operating
EPA assessment is the one instrument on record for this project. Later steps appear here as the public registers record them.
- EPA assessment, McGraths Pit Quarry and Cocked Hat Hill Quarry (Class 2B)Tasmania · Board of the EPA Tasmania12 Apr 2024 → pending2 years 7 months so farIn assessment↗
Reports on this project
- Project brief, free.
- Project dossier, On enquiry.
- Insights report, On enquiry.
The facts on this page stay free.
What each containsSite constraints
Site constraints
Nearby
- Western Junction Quarry Southern Expansion, Western JunctionApproved5 km
- Dunedin Compost Facility, St LeonardsIn assessment7 km
- Illawarra Main Road UpgradeUnder construction · $80m8 km
- Tyre Storage, 437 Woolmers Lane, LongfordIn assessment9 km
- Longford Brick Works, New Scrubber Installation, LongfordIn assessment9 km
- Ti Tree Bend Sewerage Treatment Plant Transformation, InvermayIn assessment12 km
Sources
- EPA Tasmania, proposals assessed by the EPAEPA Board assessment: Assessment Commenced. Retrieved 25 November 2026.
- Geoscience Australia, Electricity InfrastructureDistance to the grid, measured by claused. from the project's mapped point. Licence: CC BY 4.0.
Spotted an error? Tell us.
Get every change to waste and recycling projects in TAS, and the firms you follow, in the Monday briefing.