Moranbah Solar Farm

Batteries and pumped hydro · Moranbah · Queensland

Capacity
171 MW
To a 132 kV line
14 km

Overview

Last activity 23 May 2026

Awarded in the Capacity Investment Scheme (CIS Tender 7 - NEM Generation, announced 23 May 2026). Solar + battery (100 MWh).

Location
Moranbah (town centre; the tender results do not give the site), Queensland-21.9405, 147.8809
Value
Not published
Technology
Solar and battery, 171 MW, with 100 MWh of storage
Distance to the grid
14 km to a 132 kV line. 81 km to 275 kV. 16 km to Moranbah substation (132 kV).Straight line to operational lines and substations of 132 kV or more.

Approval progress

No approval on record
  1. PlanningNow

Early signals

  1. 23 May 2026Awarded Commonwealth underwriting in the Capacity Investment SchemeCIS Tender 7, NEM Generation, announced 23 May 2026. 171 MW, 100 MWh.Capacity Investment Scheme. A signal is not a planning approval.Awarded

No state or federal approval is recorded yet. Projects appear here once lodged with the approving authority or referred under the EPBC Act. Get an email when that happens.

Reports on this project

  • Project brief, free.
  • Project dossier, On enquiry.
  • Insights report, On enquiry.

The facts on this page stay free.

What each contains
© OpenStreetMap · OpenMapTiles · OpenFreeMap
Open in the map

Site constraints

Public maps asked live, on the site and within 5 km · How it works

Site constraints

Public maps, checked as this page opens · within 5 km
Checking national and QLD maps…

Who's involved

From the registers, certificates and disclosures that name the project
  1. Moranbah Ammonium Nitrate ProjectApproved12 km
  2. Construction and operation of an extension to the existing underground coal mine, Grosvenor Mine, neApproved13 km
  3. Moranbah North & Grosvenor Mines rail and pipeline realignmentIn assessment17 km
  4. Grosvenor Mine – Additional Drainage & Ventilation Surface DisturbanceIn planning18 km
  5. Moranbah North Mine Extension (ML700042) – Additional Drainage & Ventilation Surface Disturbance and 100s Longwall Series ExtensionIn planning18 km
  6. Moranbah North Extension Project, Moranbah, QldApproved19 km

Sources

Every fact links to the public record it came from · How the Pipeline is built
  1. Capacity Investment Scheme tender results, DCCEEWPlaced at the centre of its suburb (ABS). Licence: CC BY 4.0. Retrieved 22 November 2026.
  2. Geoscience Australia, Electricity InfrastructureDistance to the grid, measured by claused. from the project's mapped point. Licence: CC BY 4.0.

Spotted an error? Tell us.