Moranbah Solar Farm
Batteries and pumped hydro · Moranbah · Queensland
- Capacity
- 171 MW
- To a 132 kV line
- 14 km
Overview
Awarded in the Capacity Investment Scheme (CIS Tender 7 - NEM Generation, announced 23 May 2026). Solar + battery (100 MWh).
- Location
- Moranbah (town centre; the tender results do not give the site), Queensland-21.9405, 147.8809
- Value
- Not published
- Technology
- Solar and battery, 171 MW, with 100 MWh of storage
- Owner
- Zero E/Grupo Cobra
- Distance to the grid
- 14 km to a 132 kV line. 81 km to 275 kV. 16 km to Moranbah substation (132 kV).Straight line to operational lines and substations of 132 kV or more.
Approval progress
- PlanningNow
- Assessment
- Approved
- Construction
- Operating
Early signals
- 23 May 2026Awarded Commonwealth underwriting in the Capacity Investment SchemeCIS Tender 7, NEM Generation, announced 23 May 2026. 171 MW, 100 MWh.Capacity Investment Scheme. A signal is not a planning approval.Awarded
No state or federal approval is recorded yet. Projects appear here once lodged with the approving authority or referred under the EPBC Act. Get an email when that happens.
Reports on this project
- Project brief, free.
- Project dossier, On enquiry.
- Insights report, On enquiry.
The facts on this page stay free.
What each contains© OpenStreetMap · OpenMapTiles · OpenFreeMap
Open in the mapSite constraints
Site constraints
Checking national and QLD maps…
Who's involved
- Zero E/Grupo CobraOwner
Nearby
- Moranbah Ammonium Nitrate ProjectApproved12 km
- Construction and operation of an extension to the existing underground coal mine, Grosvenor Mine, neApproved13 km
- Moranbah North & Grosvenor Mines rail and pipeline realignmentIn assessment17 km
- Grosvenor Mine – Additional Drainage & Ventilation Surface DisturbanceIn planning18 km
- Moranbah North Mine Extension (ML700042) – Additional Drainage & Ventilation Surface Disturbance and 100s Longwall Series ExtensionIn planning18 km
- Moranbah North Extension Project, Moranbah, QldApproved19 km
Sources
- Capacity Investment Scheme tender results, DCCEEWPlaced at the centre of its suburb (ABS). Licence: CC BY 4.0. Retrieved 22 November 2026.
- Geoscience Australia, Electricity InfrastructureDistance to the grid, measured by claused. from the project's mapped point. Licence: CC BY 4.0.