Moorabool Battery

Batteries and pumped hydro · Moorabool · Victoria

Capacity
300 MW
To a 132 kV line
0.4 km

Overview

Last activity 24 June 2026

Awarded in the Capacity Investment Scheme (CIS Tender 8 - NEM Dispatchable, announced 24 June 2026). 300 MW battery.

Location
Moorabool (town centre; the tender results do not give the site), Victoria-38.0499, 144.2801
Value
Not published
Technology
Battery, 300 MW, with 1,200 MWh of storage
Distance to the grid
0.4 km to a 500 kV line. 2.1 km to Moorabool substation (500 kV).Straight line to operational lines and substations of 132 kV or more.

Approval progress

No approval on record
  1. PlanningNow

Early signals

  1. 24 June 2026Awarded Commonwealth underwriting in the Capacity Investment SchemeCIS Tender 8, NEM Dispatchable, announced 24 June 2026. 300 MW, 1,200 MWh.Capacity Investment Scheme. A signal is not a planning approval.Awarded

No state or federal approval is recorded yet. Projects appear here once lodged with the approving authority or referred under the EPBC Act. Get an email when that happens.

Reports on this project

  • Project brief, free.
  • Project dossier, On enquiry.
  • Insights report, On enquiry.

The facts on this page stay free.

What each contains
© OpenStreetMap · OpenMapTiles · OpenFreeMap
Open in the map

Site constraints

Public maps asked live, on the site and within 5 km · How it works

Site constraints

Public maps, checked as this page opens · within 5 km
Checking national and VIC maps…

Who's involved

From the registers, certificates and disclosures that name the project
  1. Residential Development, 200 Ballan Road, MooraboolIn assessment4 km
  2. Residential Development, 20 Evans Road, Bell Post HillIn assessment5 km
  3. Residential Development, 100 Ballan Road, Bell Post HillIn assessment5 km
  4. Residential Development, 60 Avonlea RoadIn assessment5 km
  5. Residential Development, 60 Ballan Road, Bell Post HillIn assessment5 km
  6. Residential Development, 35-55 Ballan Road BatesfordIn assessment6 km

Sources

Every fact links to the public record it came from · How the Pipeline is built
  1. Capacity Investment Scheme tender results, DCCEEWPlaced at the centre of its suburb (ABS). Licence: CC BY 4.0. Retrieved 22 November 2026.
  2. Geoscience Australia, Electricity InfrastructureDistance to the grid, measured by claused. from the project's mapped point. Licence: CC BY 4.0.