Macorna Wind Farm

Wind · Victoria

To a 132 kV line
7.9 km

Overview

Last activity 2026
Location
Victoria-35.9140, 144.0565
Value
Not published
Approving authority
Australian Government (DCCEEW)
Distance to the grid
7.9 km to a 220 kV line. 19 km to Kerang substation (220 kV).Straight line to operational lines and substations of 132 kV or more.

Approval progress

1 approval on record
  1. Planning
  2. AssessmentNow

The EPBC referral is the one instrument on record for this project. Later steps appear here as the public registers record them.

  • EPBC Act referralCommonwealth · Australian Government (DCCEEW) · EPBC 2026/10643
    Controlled action, in assessment↗

Reports on this project

  • Project brief, free.
  • Project dossier, On enquiry.
  • Insights report, On enquiry.

The facts on this page stay free.

What each contains
© OpenStreetMap · OpenMapTiles · OpenFreeMap
Open in the map

Site constraints

Public maps asked live, on the site and within 5 km · How it works

Site constraints

Public maps, checked as this page opens · within 5 km
Checking national and VIC maps…
  1. Mologa Solar Hybrid (Solar Farm and Battery Energy Storage System)In planning29 km
  2. Koondrook-Perricoota Forest Flood WorksApproved30 km
  3. Meering West Wind FarmIn planning33 km
  4. Cannie Wind FarmIn assessment33 km
  5. Gunbower National Park Floodplain Restoration ProjectIn assessment33 km
  6. Third Reedy Lake Bypass Project, 11 kms NW Kerang, VictoriaApproved34 km

Sources

Every fact links to the public record it came from · How the Pipeline is built
  1. EPBC Act referrals, Australian GovernmentLicence: CC BY 4.0. Retrieved 22 November 2026.
  2. Geoscience Australia, Electricity InfrastructureDistance to the grid, measured by claused. from the project's mapped point. Licence: CC BY 4.0.

Spotted an error? Tell us.