Little River Battery Energy Storage System

Batteries and pumped hydro · Greater Geelong · Victoria

To a 132 kV line
9 km

Overview

Facilitates the use and development of land associated with the Little River Battery Energy Storage System (BESS), which comprises of a 770MWh BESS, subdivision of land and native vegetation removal, by applying the Specific Controls Overlay and inserting a new Incorporated Document titled Little River Battery Energy Storage System (BESS) (Department of Transport and Planning, March 2025).

Location
Greater Geelong (council area centre; the amendment names the council, not the site), Victoria-38.0445, 144.4635
Value
Not published
Approving authority
Victorian Minister for Planning
Distance to the grid
9 km to a 220 kV line. 12 km to Geelong substation (220 kV).Straight line to operational lines and substations of 132 kV or more.

Approval progress

1 approval on record
  1. Planning
  2. Assessment
  3. ApprovedNowApproved 4 May 2025

Planning scheme amendment is the one instrument on record for this project. Later steps appear here as the public registers record them.

Early signals

  1. Date not publishedAwarded Commonwealth underwriting in the Capacity Investment SchemeCIS Tender 3, NEM Dispatchable. 350 MW, 1,400 MWh.Capacity Investment Scheme. A signal is not a planning approval.Awarded
  • Planning scheme amendment (Greater Geelong)Victoria · Victorian Minister for Planning · C466ggee
    Lodged, date not published → 4 May 2025
    Approved↗

Reports on this project

  • Project brief, free.
  • Project dossier, On enquiry.
  • Insights report, On enquiry.

The facts on this page stay free.

What each contains
© OpenStreetMap · OpenMapTiles · OpenFreeMap
Open in the map

Site constraints

Public maps asked live, on the site and within 5 km · How it works

Site constraints

Public maps, checked as this page opens · within 5 km
Checking national and VIC maps…
  1. Geelong Convention and Exhibition CentreApproved0.0 km
  2. Viva Energy Gas Terminal ProjectIn assessment4 km
  3. Vopak Victoria Energy TerminalIn assessment8 km
  4. Geelong Hydrogen HubIn planning8 km
  5. Youth Justice Redevelopment Project, Cherry Creek, 10 kms south west of Werribee, VIC.Approved13 km
  6. Australian Centre for Disease Preparedness Part life RefitIn planning14 km

Sources

Every fact links to the public record it came from · How the Pipeline is built
  1. Victorian planning scheme amendments, Department of Transport and PlanningAmendment C466ggee: Finished, approved, decided 2025-05-04, gazetted 2025-05-22. Retrieved 25 November 2026.
  2. Geoscience Australia, Electricity InfrastructureDistance to the grid, measured by claused. from the project's mapped point. Licence: CC BY 4.0.

Spotted an error? Tell us.

Get every change to batteries and pumped hydro projects in VIC, and the firms you follow, in the Monday briefing.