Skip to content
In planningNo EPBC referral

Killawarra Hybrid Project

Batteries and pumped hydro · Kadathinni · Western Australia

Capacity
350 MW
To a 132 kV line
0.6 km

Overview

Last activity 2 May 2026

Awarded in the Capacity Investment Scheme (CIS Tender 5 - WEM Generation, announced 2 May 2026). Solar + battery (2100 MWh).

Location
Kadathinni (town centre; the tender results do not give the site), Western Australia-29.6358, 115.6154
Value
Not published
Technology
Solar and battery, 350 MW, with 2,100 MWh of storage
Distance to the grid
0.6 km to a 330 kV line. 20 km to Three Springs substation (132 kV).Straight line to operational lines and substations of 132 kV or more.

Approval progress

No approval on record
  1. PlanningNow

Early signals

  1. 2 May 2026Awarded Commonwealth underwriting in the Capacity Investment SchemeCIS Tender 5, WEM Generation, announced 2 May 2026. 350 MW, 2,100 MWh.Capacity Investment Scheme. A signal is not a planning approval.Awarded

No state or federal approval is recorded yet. Projects appear here once lodged with the approving authority or referred under the EPBC Act. Get an email when that happens.

Reports on this project

  • Project brief, free.
  • Project dossier, On enquiry.
  • Insights report, On enquiry.

The facts on this page stay free.

What each contains
© OpenStreetMap · OpenMapTiles · OpenFreeMap
Open in the map

Site constraints

Public maps asked live, on the site and within 5 km · How it works

Site constraints

Public maps, checked as this page opens · within 5 km
Checking national and WA maps…

Who's involved

From the registers, certificates and disclosures that name the project
  1. Twin Hills Wind FarmIn planning13 km
  2. Tathra Wind FarmIn planning30 km
  3. West Erregulla Field Development Program, 40 km southeast of DongaraApproved38 km
  4. Natta 3D Seismic Acquisition Survey, 36 km east of DongaraIn assessment39 km
  5. Southwest Erregulla-1 (SWE-1), Drilling Exploration WellIn planning39 km
  6. Western Power - Eneabba Terminal (ENT) - Eneabba Zone Substation (ENB) - 132kV Transmission LineIn planning41 km

Sources

Every fact links to the public record it came from · How the Pipeline is built
  1. Capacity Investment Scheme tender results, DCCEEWPlaced at the centre of its suburb (ABS). Licence: CC BY 4.0. Retrieved 22 November 2026.
  2. Geoscience Australia, Electricity InfrastructureDistance to the grid, measured by claused. from the project's mapped point. Licence: CC BY 4.0.