Under constructionDA-650/2022 · CFT-465934 · No EPBC referral

Industrial Development, 373 Horsley Road Milperra

Freight and logistics · 373 HORSLEY ROAD MILPERRA 2214 · Canterbury-Bankstown Council · New South Wales

Estimated development cost
$48m
To a 132 kV line
4 km

Overview

Last activity 7 February 2024

Development application to Canterbury-Bankstown Council for industrial development.

Location
373 HORSLEY ROAD MILPERRA 2214, Canterbury-Bankstown Council, New South Wales-33.9329, 150.9934
Value
$48m, estimated development cost
Approving authority
Sydney or regional planning panel
Distance to the grid
4 km to a 132 kV line. 5.2 km to 330 kV. 0.8 km to Milperra substation (132 kV).Straight line to operational lines and substations of 132 kV or more.

Approval progress

2 approvals on record
  1. Planning
  2. AssessmentLodged 7 Sept 2022
  3. ApprovedApproved 3 Aug 2023
  4. ConstructionNow
  • Development applicationNew South Wales · Sydney or regional planning panel · DA-650/2022
    7 Sept 2022 → 3 Aug 202310 months
    Approved
  • Construction certificateNew South Wales · CFT-465934
    7 Feb 2024
    Certificate issued

Reports on this project

  • Project brief, free.
  • Project dossier, On enquiry.
  • Insights report, On enquiry.

The facts on this page stay free.

What each contains
© OpenStreetMap · OpenMapTiles · OpenFreeMap
Open in the map

Site constraints

Public maps asked live, on the site and within 5 km · How it works

Site constraints

Public maps, checked as this page opens · within 5 km
Checking national and NSW maps…

Comparable projects

Freight and logistics projects in New South Wales. Grey is the middle half of them, the marker is this project.
  • Modifications70 comparable projectsNone2.9 on average, half have 2 or fewer

Time to decision comes from the approval times benchmark. Condition counts are read from each consent's numbering.

Who's involved

From the registers, certificates and disclosures that name the project
  • Buildcorp Contracting NSWContractor, builder on the construction certificate
  1. Bullecourt Avenue, Milperra Stages 4-7In assessment · $153m0.8 km
  2. Bankstown Central Redevelopment Concept Plan and Stage 1 SSDA, 1 North Terrace, BankstownIn planning · $1.8bn5 km
  3. Chester Hill Waste FacilityApproved · $2m5 km
  4. Cabramatta Loop ProjectApproved · $70m7 km
  5. Forensic Pathology and Coroner's CourtApproved · $55m7 km
  6. Aussie Skips Recycling - Bellfrog St Site upgradesIn assessment · $14m8 km

Sources

Every fact links to the public record it came from · How the Pipeline is built
  1. NSW Planning Portal, development applicationsDevelopment application DA-650/2022 lodged with Canterbury-Bankstown Council on 7 September 2022. Value: the estimated cost of development the applicant lodged. Shown as approved because a construction certificate followed at the same address. © State of New South Wales (Department of Planning, Housing and Infrastructure). Licence: CC BY 4.0. Retrieved 31 October 2026.
  2. NSW Planning Portal, construction certificates2 construction certificates issued from 7 February 2024 to 28 June 2024, the first CFT-465934. Builder named: Buildcorp Contracting NSW Pty Limited. Matched to this project by claused. from the site address. © State of New South Wales (Department of Planning, Housing and Infrastructure). Licence: CC BY 4.0. Retrieved 25 November 2026.
  3. Geoscience Australia, Electricity InfrastructureDistance to the grid, measured by claused. from the project's mapped point. Licence: CC BY 4.0.