High Sea Wind Victorian Component

Wind · Victoria

To a 132 kV line
1.8 km

Overview

Last activity 2026
Location
Victoria-38.4780, 147.0840
Value
Not published
Approving authority
Australian Government (DCCEEW)
Distance to the grid
1.8 km to a 400 kV line. 8.1 km to Basslink Transition substation (400 kV).Straight line to operational lines and substations of 132 kV or more.

Approval progress

1 approval on record
  1. PlanningNow

The EPBC referral is the one instrument on record for this project. Later steps appear here as the public registers record them.

  • EPBC Act referralCommonwealth · Australian Government (DCCEEW) · EPBC 2026/10600
    Referral decided↗

Reports on this project

  • Project brief, free.
  • Project dossier, On enquiry.
  • Insights report, On enquiry.

The facts on this page stay free.

What each contains
© OpenStreetMap · OpenMapTiles · OpenFreeMap
Open in the map

Site constraints

Public maps asked live, on the site and within 5 km · How it works

Site constraints

Public maps, checked as this page opens · within 5 km
Checking national and VIC maps…
  1. Blue Mackerel Offshore Wind ProjectIn assessment6 km
  2. Greater Gippsland Offshore Wind ProjectIn assessment8 km
  3. Blue Mackerel North Offshore Wind Farm Marine SurveysIn planning9 km
  4. Aurora Green Offshore Wind ProjectIn assessment20 km
  5. Great Eastern Offshore WindIn assessment21 km
  6. Preliminary Site Investigations for Great Eastern Offshore Wind ProjectIn planning23 km

Sources

Every fact links to the public record it came from · How the Pipeline is built
  1. EPBC Act referrals, Australian GovernmentLicence: CC BY 4.0. Retrieved 22 November 2026.
  2. Geoscience Australia, Electricity InfrastructureDistance to the grid, measured by claused. from the project's mapped point. Licence: CC BY 4.0.

Spotted an error? Tell us.

Get every change to wind projects in VIC, and the firms you follow, in the Monday briefing.