Skip to content
In planningNo EPBC referral

Goulburn River Standalone BESS

Batteries and pumped hydro · Merriwa · New South Wales

Capacity
450 MW
To a 132 kV line
18 km

Overview

Last activity 2026

Awarded in the Capacity Investment Scheme (CIS Tender 3 - NEM Dispatchable). 450 MW (3 hour) battery.

Location
Merriwa (town centre; the tender results do not give the site), New South Wales-32.1162, 150.2775
Value
Not published
Technology
Battery, 450 MW, with 1,370 MWh of storage
Distance to the grid
18 km to a 500 kV line. 45 km to Wollar substation (500 kV).Straight line to operational lines and substations of 132 kV or more.

Approval progress

No approval on record
  1. PlanningNow

Early signals

  1. Date not publishedAwarded Commonwealth underwriting in the Capacity Investment SchemeCIS Tender 3, NEM Dispatchable. 450 MW, 1,370 MWh.Capacity Investment Scheme. A signal is not a planning approval.Awarded

No state or federal approval is recorded yet. Projects appear here once lodged with the approving authority or referred under the EPBC Act. Get an email when that happens.

Reports on this project

  • Project brief, free.
  • Project dossier, On enquiry.
  • Insights report, On enquiry.

The facts on this page stay free.

What each contains
© OpenStreetMap · OpenMapTiles · OpenFreeMap
Open in the map

Site constraints

Public maps asked live, on the site and within 5 km · How it works

Site constraints

Public maps, checked as this page opens · within 5 km
Checking national and NSW maps…

Comparable projects

Batteries and pumped hydro projects in New South Wales. Grey is the middle half of them, the marker is this project.
  • Modifications14 comparable projectsNone0.9 on average, half have 1 or fewer

Time to decision comes from the approval times benchmark. Condition counts are read from each consent's numbering.

Who's involved

From the registers, certificates and disclosures that name the project
  1. Goulburn River Solar FarmUnder construction · $880m25 km
  2. Hunter Valley Cheshunt ConsentApproved35 km
  3. Bylong Coal MineRefused38 km
  4. New Track Between Bylong Loop and Bylong TunnelWithdrawn38 km
  5. Liverpool Range Quarry ProjectApproved39 km
  6. Liverpool Range QuarryApproved · $3.3m40 km

Sources

Every fact links to the public record it came from · How the Pipeline is built
  1. Capacity Investment Scheme tender results, DCCEEWPlaced at the centre of its suburb (ABS). Licence: CC BY 4.0. Retrieved 22 November 2026.
  2. Geoscience Australia, Electricity InfrastructureDistance to the grid, measured by claused. from the project's mapped point. Licence: CC BY 4.0.

Spotted an error? Tell us.

Get every change to batteries and pumped hydro projects in NSW, and the firms you follow, in the Monday briefing.