Gleston Energy Park
Batteries and pumped hydro · McCullys Gap · New South Wales
- Capacity
- 400 MW
- To a 132 kV line
- 0.1 km
Overview
Awarded in the Capacity Investment Scheme (CIS Tender 8 - NEM Dispatchable, announced 24 June 2026). 400 MW battery.
- Location
- McCullys Gap (town centre; the tender results do not give the site), New South Wales-32.2133, 150.9956
- Value
- Not published
- Technology
- Battery, 400 MW, with 1,600 MWh of storage
- Owner
- Ascera Energy
- Distance to the grid
- 0.1 km to a 330 kV line. 5.2 km to Muswellbrook substation (330 kV).Straight line to operational lines and substations of 132 kV or more.
Approval progress
- PlanningNow
- Assessment
- Approved
- Construction
- Operating
Early signals
- 24 June 2026Awarded Commonwealth underwriting in the Capacity Investment SchemeCIS Tender 8, NEM Dispatchable, announced 24 June 2026. 400 MW, 1,600 MWh.Capacity Investment Scheme. A signal is not a planning approval.Awarded
No state or federal approval is recorded yet. Projects appear here once lodged with the approving authority or referred under the EPBC Act. Get an email when that happens.
Reports on this project
- Project brief, free.
- Project dossier, On enquiry.
- Insights report, On enquiry.
The facts on this page stay free.
What each contains© OpenStreetMap · OpenMapTiles · OpenFreeMap
Open in the mapSite constraints
Site constraints
Checking national and NSW maps…
Comparable projects
- Modifications14 comparable projectsNone0.9 on average, half have 1 or fewer
Time to decision comes from the approval times benchmark. Condition counts are read from each consent's numbering.
Who's involved
- Ascera EnergyOwner
Nearby
- Muswellbrook Pumped Hydro Energy StorageIn planning · $1.6m5 km
- McCullys Gap Battery Energy Storage SystemIn assessment · $499m5 km
- Bells Mountain Battery Energy Storage SystemIn assessment · $520m6 km
- Gelston Battery Energy Storage SystemIn planning6 km
- Muswellbrook Thermal Storage FacilityIn planning7 km
- Muswellbrook Solar FarmApproved · $302m7 km
Sources
- Capacity Investment Scheme tender results, DCCEEWPlaced at the centre of its suburb (ABS). Licence: CC BY 4.0. Retrieved 22 November 2026.
- Geoscience Australia, Electricity InfrastructureDistance to the grid, measured by claused. from the project's mapped point. Licence: CC BY 4.0.
Spotted an error? Tell us.
Get every change to batteries and pumped hydro projects in NSW, and the firms you follow, in the Monday briefing.