Skip to content
In planningNo EPBC referral

Emeroo BESS

Batteries and pumped hydro · Wami Kata · South Australia

Capacity
225 MW
To a 132 kV line
0.6 km

Overview

Last activity 24 June 2026

Awarded in the Capacity Investment Scheme (CIS Tender 8 - NEM Dispatchable, announced 24 June 2026). 225 MW battery.

Location
Wami Kata (town centre; the tender results do not give the site), South Australia-32.4498, 137.7999
Value
Not published
Technology
Battery, 225 MW, with 900 MWh of storage
Distance to the grid
0.6 km to a 275 kV line. 6 km to Bungala Solar Farm substation (132 kV).Straight line to operational lines and substations of 132 kV or more.

Approval progress

No approval on record
  1. PlanningNow

Early signals

  1. 24 June 2026Awarded Commonwealth underwriting in the Capacity Investment SchemeCIS Tender 8, NEM Dispatchable, announced 24 June 2026. 225 MW, 900 MWh.Capacity Investment Scheme. A signal is not a planning approval.Awarded

No state or federal approval is recorded yet. Projects appear here once lodged with the approving authority or referred under the EPBC Act. Get an email when that happens.

Reports on this project

  • Project brief, free.
  • Project dossier, On enquiry.
  • Insights report, On enquiry.

The facts on this page stay free.

What each contains
© OpenStreetMap · OpenMapTiles · OpenFreeMap
Open in the map

Site constraints

Public maps asked live, on the site and within 5 km · How it works

Site constraints

Public maps, checked as this page opens · within 5 km
Checking national and SA maps…

Who's involved

From the registers, certificates and disclosures that name the project
  1. Aurora Energy Project (AEP)In planning22 km
  2. Whyalla Hydrogen Pipeline (WHP)Approved56 km
  3. Cultana Solar Farm projectIn assessment61 km
  4. South Australian Government Renewable Hydrogen Power Station, Electrolysers and Storage FacilityApproved61 km
  5. Northern Water Desalination Plant and Water Transfer System Infrastructure ProjectIn assessment84 km

Sources

Every fact links to the public record it came from · How the Pipeline is built
  1. Capacity Investment Scheme tender results, DCCEEWPlaced at the centre of its suburb (ABS). Licence: CC BY 4.0. Retrieved 22 November 2026.
  2. Geoscience Australia, Electricity InfrastructureDistance to the grid, measured by claused. from the project's mapped point. Licence: CC BY 4.0.

Spotted an error? Tell us.

Get every change to batteries and pumped hydro projects in SA, and the firms you follow, in the Monday briefing.