Derby Solar Project

Batteries and pumped hydro · Derby · Victoria

Capacity
95 MW
To a 132 kV line
9.9 km

Overview

Last activity 9 October 2025

Awarded in the Capacity Investment Scheme (CIS Tender 4 - NEM Generation, announced 9 October 2025). Solar + battery (95 MW/ 210 MWh).

Location
Derby (town centre; the tender results do not give the site), Victoria-36.6547, 144.0362
Value
Not published
Technology
Solar and battery, 95 MW, with 210 MWh of storage
Owner
Sungrow
Distance to the grid
9.9 km to a 220 kV line. 24 km to Bendigo substation (220 kV).Straight line to operational lines and substations of 132 kV or more.

Approval progress

No approval on record
  1. PlanningNow

Early signals

  1. 9 Oct 2025Awarded Commonwealth underwriting in the Capacity Investment SchemeCIS Tender 4, NEM Generation, announced 9 October 2025. 95 MW, 210 MWh.Capacity Investment Scheme. A signal is not a planning approval.Awarded

No state or federal approval is recorded yet. Projects appear here once lodged with the approving authority or referred under the EPBC Act. Get an email when that happens.

Reports on this project

  • Project brief, free.
  • Project dossier, On enquiry.
  • Insights report, On enquiry.

The facts on this page stay free.

What each contains
© OpenStreetMap · OpenMapTiles · OpenFreeMap
Open in the map

Site constraints

Public maps asked live, on the site and within 5 km · How it works

Site constraints

Public maps, checked as this page opens · within 5 km
Checking national and VIC maps…

Who's involved

From the registers, certificates and disclosures that name the project
  1. Calder Highway Overtaking Lanes ProjectIn assessment4 km
  2. Campbells Forest Solar FarmIn planning8 km
  3. Bendigo water reclamation upgradesApproved · $293m25 km
  4. Bendigo water reclamation plant solids handling upgradeUnder construction · $148m25 km
  5. Bendigo Creek Reclamation and Rehabilitation ProjectIn assessment25 km
  6. Blue Hills QuarryIn assessment29 km

Sources

Every fact links to the public record it came from · How the Pipeline is built
  1. Capacity Investment Scheme tender results, DCCEEWPlaced at the centre of its suburb (ABS). Licence: CC BY 4.0. Retrieved 22 November 2026.
  2. Geoscience Australia, Electricity InfrastructureDistance to the grid, measured by claused. from the project's mapped point. Licence: CC BY 4.0.

Spotted an error? Tell us.

Get every change to batteries and pumped hydro projects in VIC, and the firms you follow, in the Monday briefing.