Skip to content
In planningEPBC 2026/10658 · EPBC referred, decision pending

Darnum Battery Energy Storage System

Batteries and pumped hydro · Victoria

To a 132 kV line
0.4 km

Overview

Last activity 2026
Location
Victoria-38.1245, 146.0475
Value
Not published
Approving authority
Australian Government (DCCEEW)
Distance to the grid
0.4 km to a 220 kV line. 27 km to Yallourn substation (220 kV).Straight line to operational lines and substations of 132 kV or more.

Approval progress

1 approval on record
  1. PlanningNow

The EPBC referral is the one instrument on record for this project. Later steps appear here as the public registers record them.

  • EPBC Act referralCommonwealth · Australian Government (DCCEEW) · EPBC 2026/10658
    Referred, decision pending↗

Reports on this project

  • Project brief, free.
  • Project dossier, On enquiry.
  • Insights report, On enquiry.

The facts on this page stay free.

What each contains
© OpenStreetMap · OpenMapTiles · OpenFreeMap
Open in the map

Site constraints

Public maps asked live, on the site and within 5 km · How it works

Site constraints

Public maps, checked as this page opens · within 5 km
Checking national and VIC maps…
  1. Gippsland Rail Line Upgrade - Longwarry East to TraralgonApproved12 km
  2. Residential Development, Warragul SouthIn assessment14 km
  3. Highfields Estate Residential DevelopmentIn assessment15 km
  4. Proposed residential subdivision and associated infrastructure works at 280 Weebar Road, Drouin.In assessment18 km
  5. Marinus Link underground and subsea electricity interconnector cableIn assessment29 km
  6. Bunyip North BESSIn planning29 km

Sources

Every fact links to the public record it came from · How the Pipeline is built
  1. EPBC Act referrals, Australian GovernmentLicence: CC BY 4.0. Retrieved 22 November 2026.
  2. Geoscience Australia, Electricity InfrastructureDistance to the grid, measured by claused. from the project's mapped point. Licence: CC BY 4.0.

Spotted an error? Tell us.

Get every change to batteries and pumped hydro projects in VIC, and the firms you follow, in the Monday briefing.