Capricorn BESS
Batteries and pumped hydro · Bouldercombe · Queensland
- Capacity
- 300 MW
- To a 132 kV line
- 0.4 km
Overview
Awarded in the Capacity Investment Scheme (CIS Tender 3 - NEM Dispatchable). 300 MW (4 hour) battery.
- Location
- Bouldercombe (town centre; the tender results do not give the site), Queensland-23.5333, 150.4411
- Value
- Not published
- Technology
- Battery, 300 MW, with 1,200 MWh of storage
- Owner
- Potentia Energy
- Distance to the grid
- 0.4 km to a 132 kV line. 0.4 km to 275 kV. 4.7 km to Bouldercombe substation (275 kV).Straight line to operational lines and substations of 132 kV or more.
Approval progress
- PlanningNow
- Assessment
- Approved
- Construction
- Operating
Early signals
- Date not publishedAwarded Commonwealth underwriting in the Capacity Investment SchemeCIS Tender 3, NEM Dispatchable. 300 MW, 1,200 MWh.Capacity Investment Scheme. A signal is not a planning approval.Awarded
No state or federal approval is recorded yet. Projects appear here once lodged with the approving authority or referred under the EPBC Act. Get an email when that happens.
Reports on this project
- Project brief, free.
- Project dossier, On enquiry.
- Insights report, On enquiry.
The facts on this page stay free.
What each contains© OpenStreetMap · OpenMapTiles · OpenFreeMap
Open in the mapSite constraints
Site constraints
Checking national and QLD maps…
Who's involved
- Potentia EnergyOwner
Nearby
Sources
- Capacity Investment Scheme tender results, DCCEEWPlaced at the centre of its suburb (ABS). Licence: CC BY 4.0. Retrieved 22 November 2026.
- Geoscience Australia, Electricity InfrastructureDistance to the grid, measured by claused. from the project's mapped point. Licence: CC BY 4.0.
Spotted an error? Tell us.
Get every change to batteries and pumped hydro projects in QLD, and the firms you follow, in the Monday briefing.