Bundey BESS and Solar

Batteries and pumped hydro · Bundey · South Australia

Capacity
300 MW
To a 132 kV line
4.5 km

Overview

Last activity 9 October 2025

Awarded in the Capacity Investment Scheme (CIS Tender 4 - NEM Generation, announced 9 October 2025). Solar + battery (300 MW/ 1200 MWh).

Location
Bundey (town centre; the tender results do not give the site), South Australia-33.8874, 139.2711
Value
Not published
Technology
Solar and battery, 300 MW, with 1,200 MWh of storage
Distance to the grid
4.5 km to a 330 kV line. 6.1 km to Bundey substation (330 kV).Straight line to operational lines and substations of 132 kV or more.

Approval progress

No approval on record
  1. PlanningNow

Early signals

  1. 9 Oct 2025Awarded Commonwealth underwriting in the Capacity Investment SchemeCIS Tender 4, NEM Generation, announced 9 October 2025. 300 MW, 1,200 MWh.Capacity Investment Scheme. A signal is not a planning approval.Awarded

No state or federal approval is recorded yet. Projects appear here once lodged with the approving authority or referred under the EPBC Act. Get an email when that happens.

Reports on this project

  • Project brief, free.
  • Project dossier, On enquiry.
  • Insights report, On enquiry.

The facts on this page stay free.

What each contains
© OpenStreetMap · OpenMapTiles · OpenFreeMap
Open in the map

Site constraints

Public maps asked live, on the site and within 5 km · How it works

Site constraints

Public maps, checked as this page opens · within 5 km
Checking national and SA maps…

Who's involved

From the registers, certificates and disclosures that name the project
  1. Bundey Data Centre CampusIn planning4 km
  2. Solar River ProjectApproved9 km
  3. Robertstown Battery Energy Storage SystemIn planning15 km
  4. Goyder South Hybrid Renewable Energy Facility - OTL and Substation, Worlds EndApproved21 km
  5. Goyder North Renewable Energy Facility Stage 1, BurraApproved27 km
  6. Goyder South Hybrid Renewable Energy Facility - Wind Farm 1b, 5km south BurraApproved30 km

Sources

Every fact links to the public record it came from · How the Pipeline is built
  1. Capacity Investment Scheme tender results, DCCEEWPlaced at the centre of its suburb (ABS). Licence: CC BY 4.0. Retrieved 22 November 2026.
  2. Geoscience Australia, Electricity InfrastructureDistance to the grid, measured by claused. from the project's mapped point. Licence: CC BY 4.0.