Ben Ridge Road Quarry Intensification, Mathinna Plains

Quarries and extractive · Mathinna · Tasmania

To a 132 kV line
69 km

Overview

The proposal is for the increase in production to 10 000 cubic metres per annum and material processing to 10 000 cubic metres per annum.

Location
Mathinna (locality centre; the EPA names the locality, not the site), Tasmania-41.4480, 147.9405
Value
Not published
Approving authority
Board of the EPA Tasmania
Distance to the grid
69 km to a 220 kV line. 71 km to Hadspen substation (220 kV).Straight line to operational lines and substations of 132 kV or more.

Approval progress

1 approval on record
  1. Planning
  2. AssessmentLodged 2 Oct 2023
  3. ApprovedNow

EPA assessment is the one instrument on record for this project. Later steps appear here as the public registers record them.

  • EPA assessment, Ben Ridge Quarry (Class 2A)Tasmania · Board of the EPA Tasmania
    2 Oct 2023 → 19 Dec 20241 year 2 months
    Assessment completed↗

Reports on this project

  • Project brief, free.
  • Project dossier, On enquiry.
  • Insights report, On enquiry.

The facts on this page stay free.

What each contains
© OpenStreetMap · OpenMapTiles · OpenFreeMap
Open in the map

Site constraints

Public maps asked live, on the site and within 5 km · How it works

Site constraints

Public maps, checked as this page opens · within 5 km
Checking national and TAS maps…
  1. Blackwood 6 Portal Development, Blackwood CollieryIn assessment21 km
  2. Blackwood 1 Redevelopment, Blackwood Colliery, CornwallIn assessment21 km
  3. Pit Extension and Rehabilitation, Cullenswood No.2, St MarysIn assessment24 km
  4. Cullenswood Mine development of open cut coal pit No. 6In planning25 km
  5. Scamander Inert Landfill, Coach Road, ScamanderApproved26 km
  6. Dianas Basin Quarry Capacity Increase, St HelensApproved26 km

Sources

Every fact links to the public record it came from · How the Pipeline is built
  1. EPA Tasmania, proposals assessed by the EPAEPA Board assessment: Assessment Completed, 2024-12-19. Retrieved 25 November 2026.
  2. Geoscience Australia, Electricity InfrastructureDistance to the grid, measured by claused. from the project's mapped point. Licence: CC BY 4.0.