In planningEPBC 2026/10614 · EPBC referral decided

Battery Energy Storage System

Batteries and pumped hydro · Victoria

To a 132 kV line
0.3 km

Overview

Last activity 2026
Location
Victoria-38.2745, 146.4290
Value
Not published
Approving authority
Australian Government (DCCEEW)
Distance to the grid
0.3 km to a 220 kV line. 0.5 km to Jeeralang substation (220 kV).Straight line to operational lines and substations of 132 kV or more.

Approval progress

1 approval on record
  1. PlanningNow

The EPBC referral is the one instrument on record for this project. Later steps appear here as the public registers record them.

  • EPBC Act referralCommonwealth · Australian Government (DCCEEW) · EPBC 2026/10614
    Referral decided↗

Reports on this project

  • Project brief, free.
  • Project dossier, On enquiry.
  • Insights report, On enquiry.

The facts on this page stay free.

What each contains
© OpenStreetMap · OpenMapTiles · OpenFreeMap
Open in the map

Site constraints

Public maps asked live, on the site and within 5 km · How it works

Site constraints

Public maps, checked as this page opens · within 5 km
Checking national and VIC maps…
  1. Tramway Road BESSIn planning0.6 km
  2. Hazelwood North Lead Acid Battery Recycling FacilityApproved4 km
  3. Hazelwood Mine Rehabilitation ProjectIn assessment6 km
  4. Latrobe River Bridge Replacement Project, Tyers Road, VicApproved13 km
  5. Marinus Link underground and subsea electricity interconnector cableIn assessment15 km
  6. Delburn Wind FarmUnder construction · $789m17 km

Sources

Every fact links to the public record it came from · How the Pipeline is built
  1. EPBC Act referrals, Australian GovernmentLicence: CC BY 4.0. Retrieved 22 November 2026.
  2. Geoscience Australia, Electricity InfrastructureDistance to the grid, measured by claused. from the project's mapped point. Licence: CC BY 4.0.

Spotted an error? Tell us.

Get every change to batteries and pumped hydro projects in VIC, and the firms you follow, in the Monday briefing.