Barnawartha Solar and Energy Storage
Batteries and pumped hydro · Barnawartha · Victoria
- Capacity
- 64 MW
- To a 132 kV line
- 11 km
Overview
Awarded in the Capacity Investment Scheme (CIS Tender 1 - NEM Generation, announced 11 December 2024). Solar + Battery.
- Location
- Barnawartha (town centre; the tender results do not give the site), Victoria-36.0808, 146.6725
- Value
- Not published
- Technology
- Solar and battery, 64 MW, with 148 MWh of storage
- Owner
- Gentari
- Distance to the grid
- 11 km to a 132 kV line. 13 km to 330 kV. 24 km to Jelbart substation (132 kV).Straight line to operational lines and substations of 132 kV or more.
Approval progress
- PlanningNow
- Assessment
- Approved
- Construction
- Operating
Early signals
- 11 Dec 2024Awarded Commonwealth underwriting in the Capacity Investment SchemeCIS Tender 1, NEM Generation, announced 11 December 2024. 64 MW, 148 MWh.Capacity Investment Scheme. A signal is not a planning approval.Awarded
No state or federal approval is recorded yet. Projects appear here once lodged with the approving authority or referred under the EPBC Act. Get an email when that happens.
Reports on this project
- Project brief, free.
- Project dossier, On enquiry.
- Insights report, On enquiry.
The facts on this page stay free.
What each contains© OpenStreetMap · OpenMapTiles · OpenFreeMap
Open in the mapSite constraints
Site constraints
Checking national and VIC maps…
Who's involved
- GentariOwner
Nearby
- Howlong Sand and Gravel Quarry ExpansionApproved · $5.1m8 km
- Wodonga wastewater treatment plant capacity and emissions reduction upgradeUnder construction · $84m19 km
- Hydrogen Park Murray ValleyApproved21 km
- Albury Wodonga - Hume HighwayApproved21 km
- AWAHS - Glenroy Residential Care FacilityIn planning22 km
- Albury Wodonga Regional HospitalUnder construction · $558m24 km
Sources
- Capacity Investment Scheme tender results, DCCEEWPlaced at the centre of its suburb (ABS). Licence: CC BY 4.0. Retrieved 22 November 2026.
- Geoscience Australia, Electricity InfrastructureDistance to the grid, measured by claused. from the project's mapped point. Licence: CC BY 4.0.
Spotted an error? Tell us.
Get every change to batteries and pumped hydro projects in VIC, and the firms you follow, in the Monday briefing.