Overview

P & T King is proposing to increase production at the existing sand extractive pit located at 1226 Arthur River Road, approximately 1.2km north of the Arthur River township. Extraction is proposed to increase from 5,000 to 10,000 cubic metres per year, with no materials handling or processing.

Location
Arthur River (locality centre; the EPA names the locality, not the site), Tasmania-41.0590, 144.6780
Value
Not published
Approving authority
Board of the EPA Tasmania
Distance to the grid
83 km to a 220 kV line. 83 km to Pieman substation (220 kV).Straight line to operational lines and substations of 132 kV or more.

Approval progress

1 approval on record
  1. Planning
  2. AssessmentNowLodged 2 Apr 2026

EPA assessment is the one instrument on record for this project. Later steps appear here as the public registers record them.

  • EPA assessment, Arthur River Sand Extractive Pit (Class 2A)Tasmania · Board of the EPA Tasmania
    2 Apr 2026 → pending7 months so far
    In assessment↗

Reports on this project

  • Project brief, free.
  • Project dossier, On enquiry.
  • Insights report, On enquiry.

The facts on this page stay free.

What each contains
© OpenStreetMap · OpenMapTiles · OpenFreeMap
Open in the map

Site constraints

Public maps asked live, on the site and within 5 km · How it works

Site constraints

Public maps, checked as this page opens · within 5 km
Checking national and TAS maps…
  1. Nelson Bay River Iron Ore Mine (DSO Pit)In assessment12 km
  2. Salmon River Road Quarry, TemmaIn assessment16 km
  3. Tasmanian Advanced Minerals - Hawkes Creek silica mine expansionApproved17 km
  4. Blackwater – Silica Mine ExtensionIn assessment22 km
  5. Blackwater South Mine Silica DepositIn planning23 km
  6. Jim's Plain Renewable Energy Park, north-west TasmaniaApproved27 km

Sources

Every fact links to the public record it came from · How the Pipeline is built
  1. EPA Tasmania, proposals assessed by the EPAEPA Board assessment: Assessment Commenced. Retrieved 25 November 2026.
  2. Geoscience Australia, Electricity InfrastructureDistance to the grid, measured by claused. from the project's mapped point. Licence: CC BY 4.0.

Spotted an error? Tell us.

Get every change to quarries and extractive projects in TAS, and the firms you follow, in the Monday briefing.