Overview
P & T King is proposing to increase production at the existing sand extractive pit located at 1226 Arthur River Road, approximately 1.2km north of the Arthur River township. Extraction is proposed to increase from 5,000 to 10,000 cubic metres per year, with no materials handling or processing.
- Location
- Arthur River (locality centre; the EPA names the locality, not the site), Tasmania-41.0590, 144.6780
- Value
- Not published
- Approving authority
- Board of the EPA Tasmania
- Distance to the grid
- 83 km to a 220 kV line. 83 km to Pieman substation (220 kV).Straight line to operational lines and substations of 132 kV or more.
Approval progress
- Planning
- AssessmentNowLodged 2 Apr 2026
- Approved
- Construction
- Operating
EPA assessment is the one instrument on record for this project. Later steps appear here as the public registers record them.
- EPA assessment, Arthur River Sand Extractive Pit (Class 2A)Tasmania · Board of the EPA Tasmania2 Apr 2026 → pending7 months so farIn assessment↗
Reports on this project
- Project brief, free.
- Project dossier, On enquiry.
- Insights report, On enquiry.
The facts on this page stay free.
What each contains© OpenStreetMap · OpenMapTiles · OpenFreeMap
Open in the mapSite constraints
Site constraints
Checking national and TAS maps…
Nearby
- Nelson Bay River Iron Ore Mine (DSO Pit)In assessment12 km
- Salmon River Road Quarry, TemmaIn assessment16 km
- Tasmanian Advanced Minerals - Hawkes Creek silica mine expansionApproved17 km
- Blackwater – Silica Mine ExtensionIn assessment22 km
- Blackwater South Mine Silica DepositIn planning23 km
- Jim's Plain Renewable Energy Park, north-west TasmaniaApproved27 km
Sources
- EPA Tasmania, proposals assessed by the EPAEPA Board assessment: Assessment Commenced. Retrieved 25 November 2026.
- Geoscience Australia, Electricity InfrastructureDistance to the grid, measured by claused. from the project's mapped point. Licence: CC BY 4.0.
Spotted an error? Tell us.
Get every change to quarries and extractive projects in TAS, and the firms you follow, in the Monday briefing.