Skip to content
ApprovedNo EPBC referral

Abbot Point Coal Terminal Expansion

Ports · Queensland

To a 132 kV line
18 km

Overview

Stage 3. Duplication of the existing terminal infrastructure, which will double the Port of Abbot Point's capacity from 25 million tonnes per annum to 50 mtpa.

Location
Queensland-19.8803, 148.0828
Value
Not published
Approving authority
Queensland Coordinator-General
Distance to the grid
18 km to a 132 kV line. 67 km to 275 kV. 18 km to Bowen North substation (132 kV).Straight line to operational lines and substations of 132 kV or more.

Approval progress

1 approval on record
  1. Planning
  2. Assessment
  3. ApprovedNow

Coordinated project is the one instrument on record for this project. Later steps appear here as the public registers record them.

  • Coordinated project, environmental impact statementQueensland · Queensland Coordinator-General
    Assessment completed↗

Reports on this project

  • Project brief, free.
  • Project dossier, On enquiry.
  • Insights report, On enquiry.

The facts on this page stay free.

What each contains
© OpenStreetMap · OpenMapTiles · OpenFreeMap
Open in the map

Site constraints

Public maps asked live, on the site and within 5 km · How it works

Site constraints

Public maps, checked as this page opens · within 5 km
Checking national and QLD maps…
  1. Bowen Orbital SpaceportApproved9 km
  2. Bowen Marine Infrastructure Replacement Project (BMIRP)In planning23 km
  3. Guthalungra AquacultureApproved24 km
  4. Bowen Solar Farm, Bruce Highway, BowenApproved27 km
  5. Bowen PipelineIn assessment31 km
  6. Cape Gloucester rural residential subdivision, north of Mackay, QldApproved46 km

Sources

Every fact links to the public record it came from · How the Pipeline is built
  1. Coordinated projects, the Coordinator-GeneralDeclared a coordinated project under the State Development and Public Works Organisation Act 1971: completed eis, the Coordinator-General's evaluation report issued. The location is the indicative project area published by the Coordinator-General. © State of Queensland. Licence: CC BY 3.0 AU. Retrieved 22 November 2026.
  2. Geoscience Australia, Electricity InfrastructureDistance to the grid, measured by claused. from the project's mapped point. Licence: CC BY 4.0.

Spotted an error? Tell us.

Get every change to ports projects in QLD, and the firms you follow, in the Monday briefing.