| 10M - Lilypond Creek to Rollingstone - WCLT and bridge replacement - Various Locations | Transport and Main Roads | $1.4m | 27 July 2026 |
| FND Detailed Design for Sudley to Myall Creek (90D) Ch.193.9 to 206.8kmDesign | Transport and Main Roads | $2.5m | 29 May 2026 |
| FND BHTSP 10P Planning & Design Package - Babinda to Deeral | Transport and Main Roads | $2.5m | 1 May 2026 |
| Caloundra Road, Kawana Way Link Road and Bells Creek Arterial Road Intersection Upgrade (CKB)For Caloundra Road, Kawana Way Link Road and Bells Creek Arterial Road Intersection Upgrade | Transport and Main Roads | $16m | 5 Jan 2026 |
| B2N Rail Upgrade Duplication Study - Phase 2 PlanningConstruction | Transport and Main Roads | $1.1m | 27 Nov 2025 |
| FND_DRFA Event 25J – Design Package 1 - 32A Kennedy Highway (Cairns–Mareeba) Options Analysis and Detail Design | Transport and Main Roads | $1.2m | 25 Aug 2025 |
| 2025 - passenger rail service accessibility features data collection | Queensland Rail | $1.5m | 11 Aug 2025 |
| Project Independent Certifier (PIC)Advice · with Arcadis Australia Pacific | Transport and Main Roads | $53m | 1 July 2025 |
| General goods and services (GGS) | Seqwater | $1m | 28 Feb 2025 |
| FND DRFA 24E TC Jasper - Package 3 – 32A Kennedy Highway (Cairns to Mareeba) - Geotechnical Slips Detailed DesignDesign | Transport and Main Roads | $6m | 22 Apr 2024 |
| Hydrogen Desalination Detailed Business Case (H2DBC) – Engineering and Environmental AdvisorDesign | RDMW | $4.3m | 7 Mar 2024 |
| 2023 ready for growth program partner panel - jacobs | Queensland Rail | $2m | 13 July 2023 |
| MTR Ipswich Motorway Planning (Rocklea to Darra Remaining sections) Package 1 | Transport and Main Roads | $12m | 28 Apr 2023 |
| Business Case Uhlmann Rd to Caboolture-Bribie Island Rd Development of a PAF Business Case for the upgrade of the Bruce Highway between Uhlmann Road and Caboolture-Bribie Island Road including interchangesDesign · with WSP | Transport and Main Roads | $12m | 12 Dec 2022 |
| Freight Rail Technical Assessment Services | Transport and Main Roads | $3.7m | 4 Nov 2022 |
| Business Case for Innisfail Bypass and Bamboo CreekDesign | Transport and Main Roads | $2.4m | 24 May 2022 |
| Detailed Design - FRND 274-647 - Cairns Western Arterial Road, Redlynch Connector Road to Captain Cook Highway, duplicationDesignFor Cairns Western Arterial Road, Redlynch Connector Road to Captain Cook Highway, funding allocation | Transport and Main Roads | $21m | 5 Apr 2022 |
| 2021 civil, structural, engineering and investigative services panel - jacobs group (australia) pty ltdAdvice | Queensland Rail | $1.5m | 28 Mar 2022 |
| MTR South Bank Busway Station - Platform Widening – Detailed Design South Bank Busway Station - Platform Widening preliminary and detailed design services.Design | Transport and Main Roads | $1.3m | 31 Jan 2022 |
| Strategic Transport Model for the program business caseCN-17175 · DesignFor Stage 1 Coomera Connector | Transport and Main Roads | $1.5m | 17 Sept 2021 |
| Detailed design and documentation for Intersection Upgrades within Federal Road Safety Program at Various Cairns IntersectionsDesign | Transport and Main Roads | $1.2m | 24 June 2021 |
| Kuranda Range Road Intelligent Transport System Detailed DesignDesignFor Kuranda Range Road Upgrade | Transport and Main Roads | $3.4m | 7 June 2021 |
| Tugun to Tweed Multi-modal Route Planning Investigation and Corridor StudyCN-14817 · Design | Transport and Main Roads | $1.8m | 15 Dec 2020 |
| Gateway Motorway and Bruce Highway Upgrade PE and BCConstruction · with SMEC | Transport and Main Roads | $25m | 2 Oct 2020 |
| Gateway Motorway and Bruce Highway Upgrade PE and BC This engagement is for an Engineering Consultant to deliver the Gateway Motorway Bracken Ridge to Pine River PE & BC and the Bruce Highway Gateway Motorway to Dohles Rocks Road Supp PE & BCAdvice · with SMECFor Bruce Highway (Gateway Motorway to Dohles Rocks Road) Upgrade | Transport and Main Roads | $17m | 2 Oct 2020 |
| Design and Documentation of 6 packages on Kennedy Hwy and PPR, Stimulus package, Contract 2 | Transport and Main Roads | $1.5m | 30 Sept 2020 |
| Contract Administration Services, Deception Bay Road Interchange UpgradeAdvice | Transport and Main Roads | $7.3m | 7 May 2020 |
| Detailed Design - Mackay Ring Road to Bald Hill Road ConnectionDesign | Transport and Main Roads | $8.9m | 30 Apr 2020 |
| (Coomera to Nerang) Reference DesignCN-12956 · DesignFor Stage 1 Coomera Connector | Transport and Main Roads | $6.7m | 30 Mar 2020 |
| Provision of detailed design, documents and during construction advice for Musgrave to Red Blanket Parts A and BDesign | Transport and Main Roads | $1.2m | 26 Mar 2020 |
| Northern District High Risk Roads, Detailed Design of Stage 1 TreatmentsDesign | Transport and Main Roads | $2.7m | 2 Mar 2020 |
| Upgrade planning for Cairns Western Arterial Road (CWAR) from Brinsmead to Smithfield | Transport and Main Roads | $5.1m | 6 Jan 2020 |
| Design and Documentation for various safety treatments on Kennedy Highway (32A) between Ch 44.30 - 48.84 | Transport and Main Roads | $1.3m | 13 Dec 2019 |
| Mount Lindesay Highway – Safety Improvements SCD - CN-11579 - Preliminary and Detailed Design consultancyCN-11579 · Design | Transport and Main Roads | $2m | 6 June 2019 |
| Pacific Motorway (M1) Upgrade – EMP2DH SCD - Pacific Motorway (M1) Upgrade – EMP2DH Phase 3 – Logan Rd to Sports DriveCN-10895 | Transport and Main Roads | $30m | 24 Apr 2019 |
| Design and Documentation for various safety treatments on the Kennedy Highway between Ch 10.2-27.35 | Transport and Main Roads | $1.2m | 15 Apr 2019 |
| Detail Design Saltwater Creek Bridge Upgrade (368507 - 228-10C) | Transport and Main Roads | $4.7m | 13 Mar 2019 |
| M1 Pacific Motorway – EMP2DH – Sports Drive to Gateway Motorway (North Bound) CN-10114 M1 Pacific Motorway "EMP2DH“ Sports Drive to Gateway Motorway (North Bound) | Transport and Main Roads | $6.7m | 31 Oct 2018 |
| MTR Detailed Design for Park ‘n’ Ride Upgrades (Ormeau, Gaythorne, Ebbw Vale)Design | Transport and Main Roads | $1.4m | 24 May 2018 |
| Intersection Upgrade and Raising the Level of Mount Lindesay Hwy | Transport and Main Roads | $2.9m | 27 Mar 2018 |