| 10L - Planning & Design - Palm Ck, St Margaret Ck, Emmett Ck, MacKenzie Ck Bridge Replacements | Transport and Main Roads | $2.2m | 4 Aug 2026 |
| Nerang to Broadbeach Public Transport Route Business CaseCN-25900 · Design · with HDR PN#3113540 PO#2030 606 533 | Transport and Main Roads | $2.1m | 3 Aug 2026 |
| Original Contract Network Change & Customer Readiness Advisory ServicesAdvice | Cross River Rail Delivery Authority | $1.6m | 1 July 2026 |
| GEC299 Angus Smith Drive (Douglas) roundabout Upgrade - Design ConsultantDesign | Transport and Main Roads | $1.7m | 11 May 2026 |
| Chermside Bus Interchange and Northern Transitway (Latham Street to The Boulevard) planning | Transport and Main Roads | $4m | 5 May 2026 |
| DRFA 25HNO - Design Package 3 | Transport and Main Roads | $1.3m | 19 Feb 2026 |
| Coomera Connector (Stage 2), Shipper Drive to Yawalpah Road, planning and designCN-25193 · with HDR | Transport and Main Roads | $41m | 11 Dec 2025 |
| Dunwich (Gumpi) Ferry Terminal Upgrade Business CaseDesign | Transport and Main Roads | $1.3m | 5 Dec 2025 |
| Cypmpie Road Planning Program (Herston to Carseldine) | Transport and Main Roads | $2.5m | 7 Nov 2025 |
| Contractors - Commercial and Project EvaluationAdvice | Department of State Development, Infrastructure and Planning | $4.2m | 17 Sept 2025 |
| FND DRFA Event 25J – Design Package 3 - Detailed Design for 10P Bruce HwyDesign | Transport and Main Roads | $1.5m | 18 Aug 2025 |
| Exhibition Station Technical Advisory TeamAdvice | Transport and Main Roads | $2.8m | 1 July 2025 |
| Project Technical Advisory PartnerAdviceFor Direct Sunshine Coast Rail Line | Transport and Main Roads | $122m | 26 Sept 2024 |
| Cleveland Line Corridor Protection Study (CL-CPS) | Transport and Main Roads | $1.5m | 16 Sept 2024 |
| DRFA Event 24E - Package 8 - Various Roads - Geotechnical Slips and Pavement Reconstruction Detailed DesignDesign | Transport and Main Roads | $2.6m | 12 Aug 2024 |
| RSSSI Technical AdvisorAdvice | Transport and Main Roads | $11m | 28 Mar 2024 |
| RSSSI Project Technical AdviserAdvice | Transport and Main Roads | $24m | 12 Mar 2024 |
| Boardmen Road intersections design, Elizabeth Avenue, Miller St | Transport and Main Roads | $1.1m | 18 Dec 2023 |
| Urban Water Risk Assessment Project | RDMW | $1.3m | 7 Sept 2023 |
| 2023 ready for growth program partner panel - arup | Queensland Rail | $2m | 14 July 2023 |
| V1 NGCS Technical Design Review AdvisorAdvice | Cross River Rail Delivery Authority | $1.3m | 1 June 2023 |
| BHWA (Stage 4) Corridor Preservation Planning StudyDesign | Transport and Main Roads | $1.8m | 10 May 2023 |
| SC596401 Design servicesDesign | Transport and Main Roads | $1.5m | 24 Mar 2023 |
| Design Kin Kin Rd Widening (Stage 2 and 3) | Transport and Main Roads | $1.8m | 10 Mar 2023 |
| DRFA Event 22F - Arup - North Coast Region | Transport and Main Roads | $5.7m | 8 Mar 2023 |
| Detail Design for Tiaro Bypass on Burce Hwy (Gympie - Maryborough) (371601 - 228-10BConstruction · with SMEC | Transport and Main Roads | $15m | 1 Mar 2023 |
| 2022 - signalling engineering services panel - arup pty ltdAdvice | Queensland Rail | $2m | 9 Feb 2023 |
| Business Case Anzac Av and Uhlmann RoadDesign | Transport and Main Roads | $9.1m | 12 Dec 2022 |
| 2022 mount isa waterway resilience design consultancyDesign | Queensland Rail | $1.9m | 8 Nov 2022 |
| CRR Technical Advisor ServicesAdvice | Cross River Rail Delivery Authority | $9.7m | 30 June 2022 |
| 2021 civil, structural, engineering and investigative services panel - arup australia pty ltdAdvice | Queensland Rail | $2.9m | 12 Apr 2022 |
| MTR Linkfield Road Overpass upgrade design | Transport and Main Roads | $11m | 31 Mar 2022 |
| North Brisbane Bruce Highway Western Alternative - Initiative 4 - Planning Study (BHWA)Design | Transport and Main Roads | $3m | 8 Mar 2022 |
| Project - Fitzroy River Bridge Technical Verifier & Proof EngineerAdviceFor Rockhampton Ring Road | Transport and Main Roads | $1.2m | 15 Jan 2022 |
| Concept design and environmental studiesCN-17176 · DesignFor Stage 1 Coomera Connector | Transport and Main Roads | $22m | 2 Dec 2021 |
| Preliminary and Detailed Design and Design Support during construction - Hamilton Plains (Proserpine-Shute Harbour Road)DesignFor Proserpine - Shute Harbour Road upgrades | Transport and Main Roads | $2.9m | 1 Dec 2021 |
| Provision of Barron River Bridge Replacement Planning | Transport and Main Roads | $5.7m | 29 Nov 2021 |
| North Brisbane Moreton Bay Sequencing Plan | Transport and Main Roads | $1.6m | 22 Sept 2021 |
| Detailed Design Blackrock and Palm Tree Creek 936845 Arup Group Ltd have been consulted to prepare a P50 and P90 Total Outturn Cost Estimates (four in total) for both the Palm Tree and Blackrock Creek Bridge Strengthening Projects with the following options: a) Proposal #1 – Case B which involves the addition of new PSC deck-units to either side of the bridge and the strengthening of the internal PSC I-girders b) Proposal #3 – Option 3b” which involves the replacement of the bridge deck in its eDesign | Transport and Main Roads | $1.4m | 11 May 2021 |
| Bruce Highway Western Alternative Stage 1 (Caboolture West) Planning | Transport and Main Roads | $1.3m | 7 May 2021 |