- Settling zone
- 692 m³
- Storage zone, 50%
- 346 m³
- Required
- 1,037 m³
- Provided
- 1,442 m³
Basins sized as you draw
Type D, F and C basins from the catchment drawn on the plan, with storage as a share of settling or from months of RUSLE soil loss. The figures print on the references sheet.











