claused. ESC/Erosion and sediment control

Draw the controls.Check the numbers.Issue the set.

The drafting bench for CPESCs, environmental officers and site engineers. Draw on the sharpest current aerial or straight onto the drawings you were sent, size every basin, have the plan reviewed against the Blue Book and IECA practice, and issue an A3 set with its typical details.

No account needed to draw, check and export. Sign in to keep plans and files in the cloud.

The claused. ESC planner showing an erosion and sediment control plan for a subdivision stage on aerial imagery: sediment fences, clean and dirty water diversions, a sediment basin, check dams, a stabilised site access, a stockpile, inlet protection and a no go zone, with the controls list on the left and the schedule of quantities and checks on the right.
  1. 1Quantities totalled from the controls as they are drawn
  2. 2Checks run against the plan, here one open on the basin's shape
  3. 3The imagery source and capture date, also printed on the sheet

A demonstration plan for a subdivision stage at Menangle Park NSW. Imagery © Spatial Services, Department of Customer Service NSW, CC BY 4.0.

02Mark up

Draw on the drawings you were sent.

Upload the civil or site set and draw the controls over its pages. The sheets you issue are the client's own, title blocks intact, with the controls, a legend, the notes and quantities and the typical details added.

  1. Scale read from the title block. Applied to the sheet size the drawing was made for, so a 1:500 A1 drawing printed on A3 is measured at the right scale.
  2. Every page confirmed. Set or correct each page's scale, or mark it not to scale. Controls on an unscaled page stay off the quantities.
  3. Exported onto the original. The controls go onto each page as sharp vector linework, not a flattened image.
  4. Locked PDFs handled. They can still be marked up, and are issued on claused. sheets with the page as the background.
A civil drawing, sheet C-120 at 1:500 on A1 printed on A3, exported from claused. with the erosion and sediment controls drawn over it and a legend box in the top left corner. The civil title block is unchanged.
The mark up dialog: page 1 reads a title block scale of 1:500 at A1 on an A3 page, and page 2 is marked not to scale.
The page as exported, and the dialog that read its scale. A demonstration civil drawing.

03Any file

Any file in, placed with its evidence.

Drop a mixed folder. Each file is sorted by what it is, not what it is called, and every drawing on a sheet carries a note of how it was placed.

PDFPNGJPGHEIC
DrawingPlaced by its printed scale, matched points or a measured dimension
GeoPDFGeoTIFFImage + world file
Placed by its coordinatesNo points to pick
SHPGeoJSONKMLKMZGPXCSV
Map layerIn its own coordinate system, or a zone you choose
DXF
CAD layerLayers, units and grid. Contours give catchment slope
DOCXXLSXEmailLandXML
Kept with the planIncluded in the issued pack if you tick it
DWGDGN
Kept, export to draw overSave a DXF or PDF from CAD, with the steps shown
ProgramsScripts
RefusedChecked by content, not just by name
Pin to the map0.2 m

Fit to 4 points: 0.2 m on average, a good fit at plan scale.

  • A0.1 m
  • B0.3 m
  • C0.2 m
  • D0.2 m
Agrees with the printed scale, 0.1% apart.

Match two to six points between the drawing and the map. With three or more the fit is measured in metres, and with four or more a mispicked point is named. A printed scale is checked against the fit.

04Check

Checked before it leaves your desk.

The sizing and the review sit in the planner, against the plan as drawn. Nothing is retyped into a spreadsheet.

Basin · SB-01 in the plan above
V = 10·Cv·A·R
A4.21 haCv0.51R32.2 mm
Settling zone
692 m³
Storage zone, 50%
346 m³
Required
1,037 m³
Provided
1,442 m³

Basins sized as you draw

Type D, F and C basins from the catchment drawn on the plan, with storage as a share of settling or from months of RUSLE soil loss. The figures print on the references sheet.

Soil loss · worked example
A = R·K·LS·P·C
R2,000K0.040LS2.10P1.3C1.0

218 t/ha/yr Soil loss class 2, low

RUSLE for each area and stage

LS from slope length and gradient, the Blue Book soil loss class, the annual volume and the sediment storage a basin needs.

Calculate soil loss
Review
ReadyReviseNot ready
Severity
Critical, major or minor
Detail
Grounded in the plan's own numbers
Action
What to change, on which controls
Basis
The guideline it rests on

A review against the standards

The plan is read against the Blue Book and IECA practice, and in NSW against mapped acid sulfate soils, riparian land, wetlands and flood planning nearby. Clearance checks run as you draw.

Review a plan

05Issue

One A3 set, ready to submit.

Your logo and organisation in the title block, the imagery source and capture date, the placement of every drawing used and the documents you chose to include, as one PDF.

Sheet 01 of the exported set: the erosion and sediment control plan on greyscale aerial imagery with MGA grid coordinates, notes, legend, schedule of controls with typical detail references, revision table and title block.
Sheet 01 of the set the planner exported for the plan above. Select it to open it full size.
Sheet 02: typical details for sediment fence, diversion channel and bank, rock check dam and stormwater inlet protection.Sheet 03: further typical details for the controls on the plan.Sheet 04: applicable standards and references, and the sediment basin calculations.
Drawing register
SheetTitle
01Erosion and sediment control planThe controls on the aerial or on your drawing pages, with the legend, notes and schedule of controls
02 to 03Typical detailsOne for every control on the plan, with construction notes and the standard drawing it corresponds to
04References and calculationsThe standards that apply in the plan's state, and the basin settling, storage and capacity
App.Attached documentsCouncil standard drawings, consent conditions and reports you chose to include
Open the export

06Mapping

The sharpest current aerial, dated on every sheet.

Imagery from several sources is compared at the site. The sharpest capture is shown unless a newer one is more than three months fresher, and the newest is one click away when the site has changed.

NSW Government aerial imagery from April 2022 at 7 cm: the subdivision stage under construction, with roads, cul-de-sacs, bare lots and sediment fences visible.
SharpestNSW, Apr 2022, 7 cm
Esri World Imagery from July 2025 at 34 cm: the same streets, now with houses built.
NewestEsri, Jul 2025, 34 cm

The same streets at Menangle Park, captured in the planner. In 2022 the stage is under construction, sediment fences and all. By 2025 it is built. Imagery © Spatial Services, Department of Customer Service NSW, CC BY 4.0. World Imagery: Esri, Maxar, Earthstar Geographics.

Aerial imagery
NSW and Queensland government imagery compared with Esri World Imagery by capture date and resolution at the site. The source and capture date are printed on the sheet.
Contours and hillshade
Nationwide from a terrain model, labelled at the interval you choose.
Lots
NSW lot boundaries and lot and plan search.
Constraints
Acid sulfate soils, riparian land, wetlands, drinking water catchments, flood planning, landslide risk and mapped watercourses, live from the NSW publishers.

07Library

The references, on hand.

In your browser

Free to draw, check and issue

  • Plans kept in the browser and saved as a plan file you can share
  • Every drawing tool, check and export
  • A daily allowance of plan reviews
Signed in

Your plans, files and firm

  • Plans and original files kept in the cloud, on any computer
  • Your logo, organisation and CPESC details on every sheet
  • An organisation library of standard drawings, logos and note sets
  • More plan reviews each day
Sign in

About standard drawings. Blue Book, IECA and Catchments & Creeks drawings are copyright. claused. ESC draws its own typical details, links to the official drawings, and lets you attach the drawings your council or consent requires so they print in the set behind the plan.

Open the planner and draw the first line.

Your dataPlans and worksheets stay in your browser unless you sign in to save them to your account, ask for a review, or download the set as a PDF.A review sends a summary of the plan's controls, measurements, notes and calculations, not the map or your files, for processing by Anthropic's Claude. We do not store the summary. The review it returns is saved with your plan.Download PDF sends the finished sheets, with their map and drawing images, to our server in Sydney to be made into one PDF. We do not store them.
Responsibilityclaused. ESC is a drafting aid. The plan, its calculations and its controls remain the responsibility of the person who signs the plan.